25
FLOOR HEIGHT
The lift is adjusted to the required floor height prior to delivery.
CHAIN ADJUSTMENT
The chain tension on the left hand side can be adjusted if it becomes slack, by loosening off
two nuts, pulling the chain to suit and then re-tightening the nuts.
ALLOWABLE PROJECTIONS
Packing may be used to overcome minor projections i.e. bolt or rivet heads.
Horizontal projections below the beam i.e. lights, chassis etc. are permissible, provided that
they do not project more than 20mm beyond the flat surface onto which the tail lift is to be
mounted. This is to conform to the minimum toe gap requirement of 75m (See BS6109
Appendix C).
REMOVAL
The lift assembly may be removed using normal safe Engineering Practice.
Attention must be made regarding the HEAVY DUTY SPRINGS warning at the front of this
handbook.
Also refer to the Service Safety Handbook supplied with the lift assembly.
Loosen nuts to
adjust chain tension
Summary of Contents for V 1000 LQ
Page 1: ......
Page 6: ...2 ...
Page 27: ...23 LABELS LAYOUT ...
Page 28: ...24 DEMARKATION Ensure all reflective flag s and or strips are applied as necessary ...
Page 31: ...27 ELECTRICAL CIRCUIT DIAGRAM ...
Page 33: ...29 ...