Chapter 6 Ancillary equipment
81
Assembling the pulley head:
x
Put the main boom in horizontal position, outer boom in vertical position (refer 'Moving crane in
working position' in chapter 7)
x
Extend the extension booms until approx. 50 cm (2 ft) before the pulley head.
1.
Put the connecting block into the extension boom.
2.
Fix the connecting block and secure it with the pin.
3.
Extend the extension boom until the connecting block can be attached to the pulley head.
4.
Attach the connecting block to the pulley head, lock the bolt.
5.
Rotate the pulley head upwards, until it is possible to fix it in the load lug.
6.
Fix the pulley head in the load lug, lock the pin.
1
1
1
3
1
4
1
5
1
6
2
x
Raise the outer boom to horizontal. Lower the main arm until it is possible to mount the
intermediate rollers.
x
Reel off sufficient rope.
x
Switch off crane.
x
Reeve the rope.
x
Assemble the lower load block.
x
Check rope guidance and rope.
x
While operating the winch the rope must run over all of the pulleys (additional rollers, guide
pulleys), etc.).
Danger!
If the rope is not properly reeved, this may lead to
damages. There is risk of injury or even fatal injury.
Example:
x
Move the load arm to a working position.
Warning!
When mounting or dismounting the crane and while
moving it in transport or working position there is serious risk of
getting crushed!
Summary of Contents for PK9001-EH
Page 1: ......
Page 2: ......
Page 4: ......
Page 8: ......
Page 12: ......
Page 14: ......
Page 24: ......
Page 26: ......
Page 30: ......
Page 38: ...Device and function 32 Overview of labels...
Page 48: ......
Page 50: ......
Page 78: ......
Page 80: ......
Page 102: ......
Page 104: ......
Page 122: ......
Page 124: ......
Page 136: ......
Page 148: ......
Page 150: ......
Page 160: ...Maintenance 154...
Page 168: ......
Page 176: ......
Page 178: ......
Page 180: ......
Page 183: ...Chapter 13 177 C H A P T E R 1 3 Technical description...
Page 184: ...178...