Doc : Q066
Rev
: 10
Issued
: 01/11/13
Page
: 7
of
25
8.5
Check valve position and repeat steps 2 to 4 until desired valve position is
reached.
8.6
Tighten the protective nut on the applicable end stop screw.
8.7
Repeat steps 8.2 to 8.6 for the remaining end stop screw.
9.
Preparations for Start-Up
Pneumatic Connections & Considerations
9.1
Prior to connecting the pneumatic supply line(s), check that all pipes and fittings
are in accordance with the plant specifications.
9.2
Check that all pneumatic supply lines are free of any contaminants or debris, and
that they are suitably supported to minimise any stress caused by vibration.
9.3
Connect the pneumatic supply line fasteners.
9.4
Check fasteners for any leaks, and ensure that they are sufficiently tightened to
avoid the chance of becoming loose due to any vibrations created during
operation.
Electrical Connections & Considerations
NOTE: All electrical connections are the responsibility of the user.
9.5
For installations in hazardous areas, ensure all electrical fittings have the correct
hazardous area certification.
9.6
Ensure that the actuators and any control components are suitably protected
against lightning strikes, electrical surges and spikes; and any magnetic fields.
Actuator Stroking
9.7
Stroke the actuator to check that smooth and continuous operation is achieved.
In the event of uneven stroking, or stroking speeds below those detailed on the
test certificate; first check to ensure correct pneumatic supply pressure and flow
rate. Further fault finding procedures can be found in Section 16.
10.
Manual Override Operation
10.1
Double-Acting Actuator with Handwheel Type Manual Override
(See Section 16.6, Dwg. HYX-XXX-HDXXX-00-001-PL)
a. Isolate pneumatic supply, depressurise actuator and control system.
b. Remove tubing and fittings from actuator supply inlets to ensure that both sides of
the piston are free to ‘breathe’ to atmosphere.
c. Move the lever on the handwheel frame mounting flange to the ‘ENGAGED’
position.
d. Rotate the handwheel clockwise to close, or anti-clockwise to open the valve.
Summary of Contents for PNS Series
Page 14: ...Doc Q066 Rev 10 Issued 01 11 13 Page 14 of 25 16 1 XXX XXX FRXXX 00 001 PL...
Page 15: ...Doc Q066 Rev 10 Issued 01 11 13 Page 15 of 25 16 2 XXX XXX FRXXX 00 002 PL...
Page 16: ...Doc Q066 Rev 10 Issued 01 11 13 Page 16 of 25 16 3 PNX XXX CYXXX 00 001 PL...
Page 17: ...Doc Q066 Rev 10 Issued 01 11 13 Page 17 of 25 16 4 XXX XXX SRXXX 00 001 PL...
Page 18: ...Doc Q066 Rev 10 Issued 01 11 13 Page 18 of 25 16 5 XXX XXX SRXXX 00 002 PL...
Page 19: ...Doc Q066 Rev 10 Issued 01 11 13 Page 19 of 25 16 6 HYX XXX HDXXX 00 001 PL...
Page 20: ...Doc Q066 Rev 10 Issued 01 11 13 Page 20 of 25 16 7 XXX XXX SHXXX 00 001 PL...
Page 21: ...Doc Q066 Rev 10 Issued 01 11 13 Page 21 of 25 16 8 HYX XXX CYXXX 00 002 PL...
Page 22: ...Doc Q066 Rev 10 Issued 01 11 13 Page 22 of 25 16 9 PNX XXX CYXXX 00 002 PL...