DESIGN AND PRINCIPLE DO 
DEVICE 

 

 Gas  supply  system    :  For  the  safe  operation    of  the 
device, the pressure on the gas on the grid  must be at 

least 30 mbar, but not over 60 mbar.  

After connecting the gas connection kit to the grid 
and device, open the gas tap, after which the gas 
will  begin  to  be  supplied  through  the  gas  filter, 
solenoid valve, noodles in the combustion chamber.  
 Air  supply  system    :  The  engine  will  turn  the  fan 
blades, which in turn will provide the necessary air 
flow within the device.    The flow of air created in 
this  way,  dragging  with  it  heat  created  during  the 
combustion of the gas-air mixture and combustion 
products  formed  during  this  process,  is  fed  in  the 
heated zone. 
Ignition system  : The control electronics according 
to  the  specified  temperature  parameters  give  an 
electric signal of high voltage to the candle, which 
under  this  influence  begins  to  spark  and  thereby 
ignites the gas mixture.   

Security and control system : For your safety , the 
device is equipped with three sensors 

flame ionization control  

  Air flow sensor 

 overeating sensor 

In  some  countries,  such  as  Ukraine,  Russia,  etc., 

according to the requirements, a fourth sensor 
-   a minimum throttle pressure sensor - must be 

installed. 

 
 

 

 

 

 

 
 

 

 

 

 

  Air flow sensor 

 

Rice.  3   security elements. 

 

  In connection with the continuous work on 
improving the device, increasing its reliability and 
quality, changes can be made to the design of the 
device that is not reflected in this documentation. 

 

 DEVICE INSTALLATION 

 

 Gas supply system

 

 

Combined  Electromagnetic  Valve 

 

 

 

 

 
 

 

 

 

 

 

 

ionization flame controller  

 

  air combustion

, heating of air

 

 

Rice.  2 Device in +  principle of operation 

The  gearbox  is  installed  separately  in  front  of  each 

device  or  single  common  gearbox  on  the  central  gas 
supply  pipe.  Before  each  device,  a  filter  must  be 
installed to prevent a solenoid valve from blocking due 

to  possible  contamination  of  the  pipeline  (despite  the 
fact that the solenoid valve is blocked) to clean them). 
Connecting  to  the main  pipeline is  being implemented 
top  or  side,  since  the  link  at  the  bottom  will  be  Serve 
Collection Pollution What Can Influence On Normal Do 
Device. 

 certification 

sensor 

 

 

 certification 

sensor 

 Opposing fuses and flame stitches 

 

 

RELATED: LH heat generators-...   

 it can   only

 

work 

   with 

 gas 

 

 in  

 The devil's 

mind.

 

 When working on natural gas, it's over 90 

milligrams.

 

 When working on the body throttle, the overtake of 

the gas is 50 mbar.

 

The gas too heavy is 60 milligrams.

 

STYLES: If the gas needs to exceed 60 mbar. - During 

the

 the course of the reduction 

 Against if it had to

 

 .

 

Summary of Contents for LH-30

Page 1: ...o set back the tone of the methane in this year can lead to a job Unworthy of this accepted cooperative back occurs during work Slime said the claims were not ed Poguy s request stipulates in this art...

Page 2: ...roviding air supply 5 Device Installation 6 Suspend Device6 Connecting Power 7 Instrument Control 7 Commission 8 Instrument 8 Start Failures RESET 8 Disable device9 Possible defects and methods elimin...

Page 3: ...r required for combustion and ventilation is indicated in Annex No 1 of this manual Protect the device from the following possible impacts wind strong water rain or drip of water Do not use the device...

Page 4: ...CTERISTICS OF THE DEVICE The hole blows out the hot air Open it Box Device Remove From Her Parts Part Then Remove Protective Covers from device e g polostirene or etc Remove the protective gas cap imm...

Page 5: ...imum throttle pressure sensor must be installed Air flow sensor Rice 3 Burner security elements In connection with the continuous work on improving the device increasing its reliability and quality ch...

Page 6: ...1 207 86 kJ m K T temperature difference in Kelvin 110 100 value returns a 10 premium for rapid warming 103 100 value pays a surcharge of 3 on loss of body heat See the example of the calculation in t...

Page 7: ...at least 400 mm Fasten it suspension under Roof Or Ceiling On Reference beams or supports between pillars or Against the wall The suspension of the device is performed with the help of the ears Locat...

Page 8: ...that means the air temperature in the room is higher than the above This is it will continue until the air temperature in the room drops below the temperature set on the thermostat and the thermostat...

Page 9: ...to constantly monitor the temperature of the casing If the housing temperature reaches 134 the controller immediately sends a signal to control which in turn off the device and the red button light si...

Page 10: ...eventive maintenance performed by the user However in order to ensure work safety and long service life it is recommended to conduct an annual inspection by an authorized service specialist User defin...

Page 11: ...mbar Maximum 60 mbar Fan Motor 150W Operational Voltage230V 50Hz 2 1A Electrical Requirements2 1A Weight 23 1 kg Usable power Typ e LH 30 LH 40 LH 50 LH 60 LH 70 LH 80 Usable power 31kW 39 kW 51 kW 5...

Page 12: ...umption for incoming air H is calculated as follows H A V C v T x 10 3 Where is A number of air exchanges per hour V room volume Cv specific air heat 1 207 kJ m3K T Temperature difference in Calvin 3...

Page 13: ...Motorcycle fan Heat Regulator Minimum gas controller 4 Ghani thermostat 5 Air flow sensor 6 Squash sensor 7 Ionitaization of flame 8 Candles be Solenoid valve Capacitor...

Page 14: ...ree for this purpose the defective unit must be sent to the manufacturer by an act drafted by the gas management representative together with the owner of the heater The act indicates a factory number...

Reviews: