Manual Packo Ice Builders
13
3.2.
PIB operation
When starting up the PIB, proceed as indicated in the following table:
Step
Action
1
Turn on the power supply (main switch).
2
Turn on the cooling unit(s) (switches cooling units).
3
When the controls are ...
Then...
Manually
(the ice water pump is controlled by
the PIB)
Put the control switch in position
“M”.
Automatically
(the ice water pump is controlled by
an external source)
Put the control switch in position
“A”.
4
When the ice formation has reached the required level, the valve
controlling the flow of cooling agent is closed and the cooling units are
stopped.
During a prolonged period without ice building (cooling units are not
running), the cooling units can switch on and off for a short period.
5
Always leave the ice accumulator under tension to ensure proper control
of the ice capacity.