Manual Packo Ice Builders
12
3.
Start-up and normal use
3.1.
Filling PIB
The Packo Ice Builder has to be filled with pure, clear water (drinking quality) up
to 1cm above the top copper tube of the evaporator.
The ice water reservoir may only be filled with water after the
cooling circuit has been made vacuum and put under pressure.
To protect the system an inhibitor must be added to the water before
the start-up.
The PIB can be filled automatically by following these steps:
Step
Action
1
Place the switch “Level control” in position A which will open the water
supply valve.
2
The filling cycle will automatically stop when the required level has been
reached.
3
Remove the cover.
4
Add the amount of 1, 2, 3-Benzotriazol needed to the ice water reservoir.
For the required dosage please check Manual for installation/ operation/
maintenance, chapter “4. Maintenance”.
5
Put the cover plate back in place.