
SECTION 4
OPERATION
43
4.4.2 TRANSIENT EXECUTION (cont’d)
The most direct method to create a transient program is as follows.
1. From the V/I meter, press
PROGRAM
, enter the program number, press
ENTER
.
2. Press
EDIT
. Change steady-state values if desired, pressing
ENTER
after each entry.
3. Press
EDIT
again. Change segment values if desired, pressing
ENTER
after each entry.
Setting T to 0 in the first segment makes the transient a cycle based transient.
Continue pressing
ENTER
to create new segments.
4. Press
STORE
. Enter the number of desired events then
STORE
again.
5. Execute the program’s steady-state values by pressing
PROGRAM, EXECUTE
.
6. Execute the program’s steady-state values by pressing
TRANS
. Pressing the
TRANS
key
again will stop the transient if still active.
4.4.2.1 MIL-STD-704D TRANSIENT PROGRAMS
The UPC is capable of producing the Voltage and Frequency excursions required by MIL-STD-704D.
Programs 100-103 are permanent, pre-stored, non-executable transient programs. These permanent
programs may be copied to any of programs 1 - 99 for execution. To copy programs see section 4.6.1.1.
Program 100 is a MIL-STD-704D overvoltage transient.
Program 101 is a MIL-STD-704D undervoltage transient.
Program 102 is a MIL-STD-704D over-frequency transient.
Program 103 is a MIL-STD-704D under-frequency transient.
The four voltage and frequency programs are for equipment which is nominally powered by 115/200
volts and a nominal Frequency of 400 Hz. Transient program data is stated for over/under voltage and
over/ under frequency tests as specified by paragraph 5.2.3 of MIL-STD-704D is provided in the
following paragraphs.
The data presented in this section is based on MIL-STD-704D dated 30 SEP 1980.
NOTE:
All four transients described are single event, 3 phase transients.
Summary of Contents for UPC-32
Page 2: ......
Page 12: ...SECTION 1 GENERAL viii THIS PAGE INTENTIONALLY BLANK...
Page 17: ...SECTION 1 GENERAL 5 PACIFIC Figure 1 3a SCU UPC 32 Figure 1 3b UPC 32 Figure 1 3c UPC 12...
Page 46: ...SECTION 4 OPERATION 34 PA CIFIC FIGURE 4 1 POWER SOURCE FRONT PANEL...
Page 77: ...SECTION 4 OPERATION 65 90 0 100 0 85 95 100 90 FIGURE 4 6 2 1 EDITED WAVEFORM...
Page 139: ...NOTES 127 NOTES...