14
After running test and checks have been completed, the hoist will be ready for normal
operation.
(1) The operator must have a clear and unobstructed view of the entire working area
before operating the hoist.
(2) The operator must check that the entire working area is safe and secure before
operating the hoist.
(3) When using the hoist with a motorized trolley, the operator must take care to
prevent excessive load swinging by sympathetic use of the trolley controls
6. MAINTENANCE AND INSPECTION
6.1 Maintenance
(1) Check the level of gearbox lubricant after the first 500 hours operation, thereafter
check every 3 months and lubricate accordingly.
Since dealing with heavy loads may involve unexpected danger all of the
“
SAFETY RULES
”
(Ref 3.) must be followed and the operator must be
aware of the following points while using the hoist.
Do not perform maintenance on the hoist while it is carrying a load except
monthly checking for the brake or limit switch.
Before performing maintenance do not forget to affix tags to the power source
and the push button switch reading :
“
DANGER
”
,
“
EQUIPMENT BEING
REPAIRED
”
.
Summary of Contents for U-MEGA Series
Page 20: ...19 7 TROUBLESHOOTING 7 1 Wiring Diagrams ...
Page 25: ...24 ...
Page 29: ...28 41 408335 Hex Recess Bolt M6 1 0 40 8 408660 Hex Recess Bolt M6 1 0 35 6 ...
Page 42: ...41 ...
Page 49: ...48 ...
Page 50: ...49 12 11 ELECTRIC ASSEMBLY 6 10 1 2 3 4 5 8 9 7 13 14 15 16 17 18 ...
Page 52: ...51 ...