![Pacific energy FP25AR Installation And Operating Instructions Manual Download Page 20](http://html1.mh-extra.com/html/pacific-energy/fp25ar/fp25ar_installation-and-operating-instructions-manual_3168608020.webp)
7'(2.13m)
Floor to ceiling Minimum
(B) 48 1/8"
1.22m
or greater
(A) 2” -12"(50-305mm)
Combustible Mantle
Mantle
Depth (A)
Height from base of unit (B)
2”(50mm) to 12"(305mm)
48"(1.22m)
(C) 16"
406mm
Height from top air deflector (C)
16"(406mm)
Mantel Clearances
Fig. #18
Convection Blower Wiring
The FP25 blowers must be connected to 120 VAC house
hold electrical system. Connect the blower circuit to a wall
switch or fan speed controller.(not supplied)
Insert the Romex 14/2 wire, or equivalent, into the unit through
the strain relief located in the junction box on the right hand
side of the support base Fig. #20.
Connect the wiring as shown in the wiring diagram below to
the wires located in the junction box. See section (Blower
Replacement) on Page 8. All electrical connections should be
performed by a certified/licensed electrician.PART# WODC.
RHKA
Fig. #19
L2 (neutral)
G (ground)
L1 (hot)
Blowers
Thermo
Switch
Junction
Box
Electrical Rating : 115 V, 60 Hz, 1.1A
To wall
switch/control
Fig. #20
ELECTRICAL
BOx
20
5055.7618_210916-32
FP25.BODYA