
The front facing area of the FP25 must be covered with non-combustible cement board prior to applying any
non-combustible finishing material.
Use the Cement Board manufacturer's guidelines and suggested fasteners to attach the cement board to the
unit and studs.
Finish the joints as per the board manufacturer's recommendations.
The cement board must cover from the floor to a height of 7ft. (2.13m) from the bottom of the fireplace
or 49 1/4" -1.25m from the top facing stop), and 58" (1.47m) wide centered on the unit.
The front casing of the fireplace has a built in facing edge/stop. DO NOT PLACE ANY CEMENT BOARD
OR FINISHING MATERIALS INSIDE THIS EDGE. Failure to comply may result in improper installation of
panels, overheating of the fireplace and blowers and may not be covered under Warranty.
Finshing The Chase
Minimum
58” (1.47m)
49 1/4” MIN.
1.25m
NON-COMBUSTIBLE CEMENT BOARD
REQUIRED IN THE HATCHED AREA.
30in2 (194cm2)
CHASE AIR INLET
Minimum
1 1/2”(38mm)
VARIOUS LOCATIONS FOR
CHASE AIR INLET, CAN ALSO
BE ON OTHER SIDE OF CHASE
Figure 29: FP25LE Facing and air inlets.
30
FP25 LE 040523-36
100003890