![Pace TF 500 Installation & Operation Instructions Download Page 6](http://html1.mh-extra.com/html/pace/tf-500/tf-500_installation-and-operation-instructions_745628006.webp)
2
Installation
The Work Platform is provided with each TF 500 ThermoFlo System.
Use the following instructions and accompanying illustrations as a guide to assemble the Work Platform.
Work Platform
1. Place the Base upside down on a work surface and install the 4 Rubber Feet (with built-in screws) at
the corners of the Base.
2. Turn the Base over and position as shown.
3. There are 2 Alignment Pins located on the bottom of the Support Arm. Insert the 2 Alignment Pins
fully into the 2 Alignment Holes in the Base.
4. Install the 4 Mounting Bolts and Lock Washers. Tighten each bolt to secure the Support Arm to the
Base.
5. Insert one end of the supplied Ground Cable into the Base as shown or into either of the 2 Groun Jacks
at the front, right side of the Base.
Operation
Ground Cable
The Ground Cable is supplied to provide a connection to the Work Platform as a part of your static control
program.
Slide Assembly
The Vertical Slide Assembly holds the ThermoFlo handpiece in a vertical position for precise component
removal and installation operations. The handpiece is installed vertical to the work platform base; the bottom
edge of any installed nozzle (except Curved, Single Jet) is horizontal to any PCB (installed on a board holder)
on the Work Platform. Refer to the Handpiece Installation procedure to properly install the handpiece.
Simply rotate either of the Vertical Control Knobs to raise or lower an installed ThermoFlo handpiece (with
attached nozzle). Refer to "ThermoFlo Handpiece" "Operation" for additional information