12
SET-UP
SYSTEM
Using Figures 1 thru 4 as a guide, set up the MBT 201A or MBT 101A system using the following steps.
1. Store the shipping container(s) in a convenient location. Reuse of these containers will prevent
damage if you store or ship the system.
2. Place Power Switch in the “Off” or “0” position.
3. Position the system on a convenient bench.
4. Plug the Power Cord into AC Power Receptacle/Fuse Holder at the rear panel of the system.
IMPORTANT
The AC supply receptacle must be checked to insure proper grounding
before initial system operation.
5. Assemble the Tip & Tool Stand(s)
and, if desired, attach to the power
source. Assembly instructions are
enclosed with each stand.
6. If you have purchased the optional
Tip & Temperature Selection
System Chart Holder, attach to the
top of the power source using the
supplied instructions.
7. Install the Tip & Temperature
Selection System Charts booklet
onto Chart Holder (if present).
This booklet is supplied with each
system.
Figure 2. Tip & Temperature Chart Holder (Optional)
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com