H9. Mount Pump Box Assembly
Mount the Controller/Pump box on a wall at a convenient position for piping and wiring. Ensure 4 plastic spac-
ers are installed behind the box so that it sits away from the wall and allows the lid to be fitted.
Place the pump inside the box and attach copper pipes to both connections so that they project through the
grommets.
Diagram – System Piping and Fittings
20
21
Summary of Contents for OZS251E
Page 1: ......
Page 2: ......
Page 20: ... FOR ILLUSTRATION PURPOSE ONLY Cold Water Valve Train Connections to Storage Tank 18 ...
Page 35: ......
Page 36: ......