background image

 

 

 

ВЗР.248100.000OM

 

 

 

Gate K-14

 

Operation Manual

 

 

23

 

APPENDIX A 

 DISTRIBUTORS AND SERVICE CENTERS 

Lists of official distributors and service centers are given in Tables 4-5 and 

are  constantly  updated.  The  latest  information  is  available  at  website 

www.oxgard.com. 

Table 4 

– Distributors and service centers in Russia 

No.

 

Company

 

Contact details

 

Status

 

1

 

Eliks trading house

 

107023, Moscow, 3, M. Semyonovskaya str., 

(Elektrozavodskaya metro station)

 

7(495)725‒66‒80

 

www.elics.ru

,

 

[email protected]

 

Distributor   Service 
center   Warehouse

 

2

 

Luis + LLC

 

125040, Moscow, Center, 1st Street Yamskogo 

Polya, 28

 

7(495)637‒63‒17 , 7(495)280‒77‒50

 

www.luis.ru       

 

 [email protected]

 

Distributor  

Warehouse

 

3

 

Luis + LLC

 

192029, 70-3A, Obukhovskoy Oborony Ave. Saint-

Petersburg,

 

7 (812) 331‒40‒41; 

 

www.luis.ru   

 

 [email protected]

 

Distributor  

Warehouse

 

4

 

Luis + LLC

 

400081, Volgograd, Bureyskaya str., 7

 

7 (8442) 43‒97‒98

 

www.luis.ru  

 

[email protected]

 

Distributor  

Warehouse

 

5

 

Luis + LLC

 

620100, 12, p. 6, Sibirsky trakt str., Yekaterinburg,

 

7 (343) 298‒20‒28

 

www.luis.ru

 

[email protected]

 

Distributor  

Warehouse

 

6

 

Luis + LLC

 

350051, Krasnodar, Dalnaya str., 2

 

7 (861) 273‒99‒03

 

www.luis.ru 

 

 [email protected]

 

Distributor  

Warehouse

 

7

 

Luis + LLC

 

420059, apt.1, 128 Orenburg tract, Kazan, 

Republic of Tatarstan

 

7 (843) 204‒22‒33

 

www.luis.ru  

[email protected]

 

Distributor  

Warehouse

 

Summary of Contents for MODELK-14

Page 1: ...VOZROZHDENIE LLC OKPD 27 90 40 190 27 90 40 001 33120038 2018 APPROVED BY 248100 000LU GATE MODELK 14 248100 000OM OPERATION MANUAL 32 sheets 2020...

Page 2: ...4 3 Maintenance 16 3 1 General Provisions 16 3 2 Safety precautions 16 3 3 Product maintenance procedure 17 3 4 Visual inspection of the product 17 3 5 Checking the product components 17 3 6 Product f...

Page 3: ...ce of the product without further notice Before using the product please read 248100 000 Logbook LB as well This OM is a document certifying the product s basic parameters and characteristics guarante...

Page 4: ...ons and banks in educational institutions sports and entertainment facilities shops terminal stations and other institutions The structural components of the product are detailed in Table 1 1 1 2 Tabl...

Page 5: ...ll dimensions of the gate with a metal tube flap W H L depending on the passage way width mm 600 mm 900 mm 1000 mm 1200 mm 810 1140 264 1110 1140 264 1210 1140 264 1410 1140 264 Weight of the gate wit...

Page 6: ...ated supply voltage ATTENTION THE CAPACITY DATA WERE OBTAINED IN EXPERIMENTAL TESTING AT 600 MM FLAP WITH NO PAUSES BETWEEN OPENING AND CLOSING Product structure 1 1 4 All gate structure members are m...

Page 7: ...Manual 7 Figure 1 Gate overall view Overall dimensions 1 1 5 Figure 2 gate overall dimensions for passage way width of 600 mm 1 Cover 2 Insert 3 Indication panel 4 Body enclosure 5 Cup 6 Glass 7 Upper...

Page 8: ...e way width of 600 mm 940 685 110 2 Gate with passage way width of 800 mm 985 940 110 3 Gate with passage way width of 900 mm 985 940 110 4 Gate with passage way width of 1000 mm 1080 940 110 5 Gate w...

Page 9: ...HALL BE INSTALLED BY QUALIFIED PERSONNEL IN ACCORDANCE WITH INSTALLATION MANUAL ATTENTION THE CONTROL PANEL WORKS ONLY AT A DISTANCE OF 5 METERS FROM THE GATE THIS IS THE DISTANCE OF THE STANDARD CABL...

Page 10: ...TENTION TO AVOID INJURIES TO PERSONS AND PRODUCT BLOCKING MAKE SURE THAT THERE ARE NO PERSONS AND FOREIGN OBJECTS WITHIN THE FLAP ROTATION AREA PRIOR TO THE PRODUCT CONNECTION 2 2 2 Rules and procedur...

Page 11: ...buttons except STOP will go out Gate is ready for operation If the panel is set incorrectly wrong frequency the buttons will not light up when you turn on the gate Set the panel to a different frequen...

Page 12: ...s on the left 1 and right 3 buttons blink Turn power on 3 Press and release the stop 2 button 4 Press and release the left button 1 Now when LEFT button is pressed it will be allowed to pass to the ri...

Page 13: ...ime the gate is turned on In this mode the gate s LED indication lights up in yellow color the gate flap is driven clockwise until the variable inductance transducer actuates then the flap moves to th...

Page 14: ...d by J2 and remains in that position for 20 minutes then returns to the closed position Gate operation in emergency situations If any object obstructs the flap movement during gate closure the flap wi...

Page 15: ...248100 000OM Gate K 14 Operation Manual 15 In case of fire switch external power supply off Use powder extinguishers to extinguish fire in the product wiring and cables...

Page 16: ...warranty period 3 1 2 Scheduled maintenance shall be performed once a year If a fault occurs maintenance should be performed immediately after troubleshooting 3 1 3 Maintenance is recommended to be pe...

Page 17: ...ction of the product condition 2 checking the fastening of product parts and components 3 general check of the product operation 3 4 Visual inspection of the product 3 4 1 Visually inspect the product...

Page 18: ...efects in the product components are found during the product MNT we recommend to contact service department for advice List of addresses of official distributors and service centers is given in Appen...

Page 19: ...to swap the CL and CH terminals When any other problems occur contact the service department 4 2 Routine repairs of the product components Routine repairs of the product components shall be carried o...

Page 20: ...40 C The storage room should be free of acid or alkali vapors or corrosive gases The short time product storage in original package shall be permitted for maximum 3 days in dry unheated rooms and enc...

Page 21: ...limiting the range by air closed motor road and rail transport provided it is protected against direct exposure to precipitation and dust When transporting and storing products on Euro pallets it is a...

Page 22: ...rvice life the product shall be disposed along with its components Examples of such disposal can be product disassembly dismantling and sorting its components into groups of similar parts converting t...

Page 23: ...Center 1st Street Yamskogo Polya 28 7 495 637 63 17 7 495 280 77 50 www luis ru luis luis ru Distributor Warehouse 3 Luis LLC 192029 70 3A Obukhovskoy Oborony Ave Saint Petersburg 7 812 331 40 41 www...

Page 24: ...tributor Warehouse 13 Luis LLC 625048 Tyumen Ervye str 9 7 3452 48 95 20 7 3452 48 95 40 7 3452 48 95 35 www luis ru samara luis ru Distributor Warehouse 14 Luis LLC 454090 Chelyabinsk Lenin Ave 35 7...

Page 25: ...ru Dealer Service center 24 Saint Petersburg Shosse Revolyutsii 31 7 812 640 85 84 7 812 655 62 05 www atmcompany ru info atmcompany ru Dealer 25 CJSC Center for Security Systems 195197 Saint Petersbu...

Page 26: ...Saint Petersburg 3rd floor 266B Ligovsky Prospekt 7 812 245 28 24 www videoglaz ru zakaz videoglaz ru Dealer 36 Birzha LLC 109052 Moscow Nizhegorodskaya str 29 33 bld 32 office 402 7 495 229 45 15 www...

Page 27: ...309 58 53 www fteq ru 4trade fteq ru Dealer 44 OOO Grumant corporation 630123 27A Krasnogorskaya str Novosibirsk 8 383 210 352 353 www grumant ru info grumant ru Dealer 45 OOO Grumant corporation 107...

Page 28: ...25 35 35 7 727 220 95 31 www security intant kz intant intant net Dealer Warehouse 4 A A Security MMC AZ1110 Azerbaijan Baku city Akhmad Bay Aga oglu str 24B 8 994 12 496 00 56 www aasecurity az info...

Page 29: ...Operation Manual 29 ABBREVIATIONS The following abbreviations are used in this document LB Logbook OM Operation Manual IM Installation Manual PSU power supply unit CP control panel ACS access control...

Page 30: ...248100 000OM Gate K 14 Operation Manual 30...

Page 31: ...248100 000OM Gate K 14 Operation Manual 31...

Page 32: ...VOZROZHDENIE LLC 192289 Saint Petersburg 66 Sofiiskaya str Telephone Fax 7 812 366 15 94 www oxgard com info oxgard com...

Reviews: