
OWC JUPITER CALLISTO
ASSEMBLY & REPLACEMENT
6
2.2 UNIT RACK INSTALLATION & REMOVAL
After installing the rails, the Jupiter Callisto can be installed into the rack. The Jupiter Callisto is heavy even when
no drives are installed. Never lift heavy equipment by yourself and always use proper lifting techniques. It is
recommended that you remove all drives from the Jupiter Callisto before installing into or removing from a rack
in order to avoid personal injury or damage to equipment.
2.2.1 Unit Installation
1. Before lifting and installing the Jupiter Callisto
into the rack, make sure all people involved in
lifting know where the unit rails are attached
to the Jupiter Callisto and how they will slide
into the rack rails.
2. Using proper lifting techniques and keeping
the Jupiter Callisto level, lift up to the rack rails
where the unit will be installed into.
3. Visually align the unit rails with the rack rails.
4. Once aligned, evenly slide the unit rails into
the rack rails. Do not release the unit until
it has been inserted all the way or until an
audible click is heard. The click indicates that
the Jupiter Callisto has been inserted past the
security latches as illustrated in
Figure 2.2.1a
.
5. If not already done, insert the Jupiter Callisto all
the way into the rack until the rack ears touch
the rack posts.
6. Install the four included rack securing screws
to finish the unit installation into the rack as
seen in
Figure 2.2.1b
. The 16-bay version is
shown, but the screw placement is similar on
the 8-bay version.
!
It is recommended that you remove all
drives from Jupiter before installing
into or removing from a rack.
!
AVOID INJURY!
- Never lift heavy equipment by yourself
- Use proper lifting techniques
!
Review precautionary measures from begining of Section 2.2 before proceding.
Keep unit level
while installing
Security Latch
Slide rack into rails
Figure 2.2.1a
Figure 2.2.1b
Rack securing screws