Fresh water station “Regumaq X-25”
Maintenance report
Date:
Installation site address / building
User address
Installation company address
“Regumaq X-25” serial number
If there are any steps you do not
complete or if you respond with ‘No’,
please explain in the comments field!
Tick as appropriate or
enter a value/number
Comments/settings
Yes
No
System information
1
Number of installed stations
2
Number of stations with circulation
3
Designation of circulation pump(s)
4
System pressure on the potable
water side
bar
5
System pressure on the storage
cylinder side
(Be sure to
compare with the
handover report
. Take a look at the
troubleshooting table in the event of
deviations)
bar
6
Performance, type and version of
the heat generator
kW
7
Storage cylinder volume
l
8
Which nominal temperature was
set on the heat generator for the
storage cylinder?
°C
Maintenance work
1
Was the station checked for leaks
(visual inspection)?
¨
¨
2
Were the electronic components
checked for tightness and intact-
ness?
¨
¨
3
Was a functional check carried out
on the safety valve (DIN EN 806-5)?
¨
¨
4
Was a functional check carried out
on the check valve for the circula-
tion pipe (DIN EN 806-5)?
¨
¨
5
Was the potable water circuit sam-
pled for microbiological examination
(TrinkwV 2012)?
¨
¨
6
Was the heat exchanger checked
for external impermeability?
¨
¨