background image

INSTALLATION INSTRUCTIONS

1

2

3

BB

AA

STEP B
It is recommended that a small diameter bit be used when first drilling ceramic tiles to avoid breaking them. 
Begin with the smaller bit and gradually move to larger drill bits until the proper sized hole is attained.
1. Level the tracks (F) and mark the track holes positions. Temporary removes the frames and ensures that
    the distance is correct. 
2. Drill pilot holes at the marked place. Ensure that the final hole is large enough to fit snugly the wall anchors.
3. Insert the wall anchors (AA) using a rubber mallet (to avoid  breaking the tiles) until the anchors are flush
     with the tile surface. Then screw the track on the wall using BB screws.

8

Summary of Contents for JERSEY

Page 1: ...ng to your retailer call our customer service department at 1 866 839 2888 9 a m 5 p m EST Monday Friday 1 OVE102012 Purchase date _________________ Product Tracking Reference ________________________...

Page 2: ...Package Contents 3 Hardware Contents 5 Safety Information 6 Preparation 6 Installation Instructions 7 Maintenance 14 Warranty 14 TABLE OF CONTENTS 2...

Page 3: ...PACKAGE CONTENTS A F E D C F M M L L I K J G H R S N O Q P B 3...

Page 4: ...bber track 1 99SRU0006 H PVC magnetic door seal 2 99SRU0021 I Rubber strip Long 1 99SRU0033 J Bottom rubber track 1 99SRU0009 K Rubber strip Short 1 99SRU0003 L Glass support bracket 2 99SGC0012 WM M...

Page 5: ...6 Brass cap fitting Qty 6 Allen key 2 5 mm Qty 1 Allen key 4 mm Qty 1 DD HH CC BB EE Screw ST4X20 Qty 2 Screw ST4X30 Qty 8 Screw ST5X35 Qty 2 Wall plug 6X30 Qty 8 AA II JJ KK 5 Wall plug 8X30 Qty 2 LL...

Page 6: ...stallation is complete Inspect all parts for damage if there is damage to the unit prior to installation please contact your distributor Install the shower on a floor that is level and able to accommo...

Page 7: ...STEP A The center of one metal track should be 30 1 2 in 775 mm from the wall And the center of another metal track should be 58 1 2 in 1486 mm from the wall The two metal tracks should be placed at a...

Page 8: ...ed hole is attained 1 Level the tracks F and mark the track holes positions Temporary removes the frames and ensures that the distance is correct 2 Drill pilot holes at the marked place Ensure that th...

Page 9: ...at the base of glass panels C E and cut it to size 2 Place the seal strips K at the base of the glass E and cut it to size 3 Insert glass panels C E into the tracks F Do not fully tighten hardware as...

Page 10: ...are on the glass panel 2 Install the bottom rubber track J on the shower door D and cut it to size The longer lip of the strip must be in the internal side of the shower 3 Install the PVC magnetic do...

Page 11: ...on shower base Remove glass support bracket L and rubber gasket FF Drill a hole in the shower base using the drill 3 Add a drop of silicone to the drilled hole Put back the rear bracket and the rubbe...

Page 12: ...marked line on the wall mark the two holes position of the bracket plate 8 Drill the two holes on the marked place 9 Insert the wall anchors AA then mount the wall bracket plates on the wall using scr...

Page 13: ...ection between the side glass panel and the frame as well as the support bar 3 Apply a clear silicone water sealant around the inside and the outside perimeter of any fixed shower components horizonta...

Page 14: ...rkmanship and materials under normal use and service for a period of one 1 year Distributor will at its election repair replace or make appropriate adjustment where distributor optional inspection dis...

Reviews: