STEP 3: LADDER HARDWARE INSTALLATION
TOP LADDER HARDWARE
1. On the outside of each ladder side rail, measure down 2” from the top of the ladder and draw a 1 1/2” line
from the back edge of the side rail
(figure 14 -
see next page for complete measurements
)
.
2. Align the top edge of the Upper Hook Assembly with the line. Clamp or hold the hardware in place to drill
the through holes in the side rail
(figure 15)
.
FIGURE 14
FIGURE 15
3. Using a 5/16” drill bit, drill out the holes for
the nut cap/threaded rod on the sides of
the ladder.
Recommended procedure for this:
•
Using the holes in the Upper Hook
Assembly as a drill guide, drill a 5/16”
hole halfway through the thickness
of the ladder slide rail
(1)
.
•
Drill the same hole on the opposite
side of the Upper Hook Assembly,
producing a 5/16” through hole in the
ladder side rail
(2)
.
•
Follow this same procedure for all
four through holes and complete the
assembly by securing the top roller
guide with the supplied nut caps and
threaded rod
(3-5)
.