
OUTLINE S.R.L.
Via Leonardo da Vinci, 56
25020 Flero (Brescia) Italy
Tel.: +39 030.3581341
Fax +39 030.3580431
www.outline.it
6
The shackle should be fastened to the pick point in-
dicated by the software.
In case common chain hoists are used, it coud be
of help to use a wire rope sling with thimbles to avoid
that the bag containing the chain leans upon the clu-
ster causing chain lock or unwanted vertical displace-
ment of the array.
It should be the authorized staff’s care to verify and
ensure the integrity and suitability of all additional rig-
ging tools. Outline, besides providing advice, assumes
no responsibility for the choice of these tools. Fur-
thermore,
Outline considers itself unrelated to any
unauthorized modification of the mechanical parts
of the frame.
Considering the high weights involved,
we remind you that these instruments must guaran-
tee maximum safety under any circumstances (whith
their appropriate use as a necessary prerequisite).
FRM1-AL630 is equipped with four solid rotatable hardware parts (two front and two rear ones), easy to
mount and fasten to the line array elements. Its load beam has 20 pick points for fastening the hoist(s), as
calculated by OpenArray2.