
OUTLINE S.R.L.
Via Leonardo da Vinci, 56
25020 Flero (Brescia) Italy
Tel.: +39 030.3581341
Fax +39 030.3580431
www.outline.it
18
3. using the hoist(s), lift the array from the trol-
ley at a suitable height to simplify the following
procedure (figure 29);
4. at this point, fasten the front hardware parts
of the first three elements that are now flown.
Help yourself with both hands to lift the ele-
ment as shown in figure 30, to be able to insert
the locking pin in the hole (figure 31). Leave out
the front hardware parts of the last element (fi-
gure 32).
figure 28
figure 29
figure 30
figure 31