OUTLINE S.R.L.
Via Leonardo da Vinci, 56
25020 Flero (Brescia) Italy
Tel.: +39 030.3581341
Fax +39 030.3580431
www.outline.it
15
4.1.2. PREPARATION OF THE FRAME BAR
It is advisable to prepare the frame immediately to
be flown together with the first two elements of the
array, to make the job easier for the staff:
1. free the rear hardware parts of the frame by
simply lifting the movable bar that will be trig-
gered, remaining stationary thanks to the auto-
matic locking system (figure 16);
2. remove the safety pins from the front locking
points and free the bar that will come out rota-
ting by itself (figure 17);
3. reinsert the locking pin and its forelock to keep
the bar in place (figure 18);
figure 16
figure 18
figure 17
figure 19