5
Hardware “O” is
used. Repeat step 5
for remaining posts.
O
Step 6:
Attach short corbels “C”
with hardware screws
“R” (upper screws should
be installed from both
sides of ledger beam)
NOTE: In the remaining steps, a rubber mallet may be useful in fitting beams together properly.
E
Step 5:
Lay columns on level sur-
face. Bolt ledger beams
assembled in step 2
to columns “A” with
beams “E” facing
upward..
Insert 2 screws “R” into each
Side of column. Ensure columns are
squared with ledger beam before
fastening. Repeat for all columns.
R
R
After end arched beams are
installed, Tall Corbel Post
Braces “B” can be attached
as shown below with hard-
ware screws “R” (Upper 3
screws are installed from
both sides of corbel). Once
corbels are in place, install
remaining arched beams
with screws “R”
Step 7:
Once header beams are
installed and bolts are
tightened, end arched
beam sections can be in-
stalled between them and
secured in place with
hardware screws “R”. Posi-
tion components with bolt
R
R
R
E
22”
16”