![Otto Bock 17KL6 Instructions For Use Manual Download Page 23](http://html1.mh-extra.com/html/otto-bock/17kl6/17kl6_instructions-for-use-manual_1659383023.webp)
Drilling bars
Holes may be drilled in the bars.
►
Drill the holes for the mounting material in the bars. The distance
between the hole and the outer edge of the bar must be at least equal to
the diameter of the hole.
►
INFORMATION: The holes must not be repaired or filled under any
circumstances.
Installing mounting materials
►
Install the mounting materials.
INFORMATION: Make sure that the mounting materials do not
obstruct the locking mechanism.
Final assembly of orthosis joint
►
Use the 633F7 special lubricant to grease the metal.
►
Secure the screw connection with Loctite 241.
INFORMATION
Delivery of finished orthosis to the patient
Prior to delivery of the orthosis to the patient, the fit, support and all func
tions must be tested.
Pay attention to the parallel alignment of the orthosis joints.
Check the locking mechanism and instruct the patient in handling the lock
and the product.
INFORMATION
Instruct the patient not to unlock the orthotic knee joints under load.
6 Patient information
Inform the patient:
Verify lock functionality
►
Before standing up, check that both locks are engaged. Carry out a
function test.
Inspect the orthosis for damage
►
Inspect the orthosis for damage daily, paying special attention to the
locks and bars. Contact the qualified personnel promptly if changes are
noted.
23
Summary of Contents for 17KL6
Page 2: ...17KL6 17KL8 1 2 ...
Page 3: ...17KL7 17KL9 2 3 ...
Page 4: ...17KL8 20 CS 3 4 ...
Page 5: ...17KL9 20 CS 4 5 ...