Page 8
13
14
15
Bottom elbows and
extensions come
wrapped together
Note:
This assembly is for the Bottom Main Frame Bar.
13
14
Small
lubrication
hole
13
31
14
31
Note:
Off set goes to the inside of the shelter.
4-5”
4-5”
13. Slide one tube inside the other as shown for the left side bottom elbow and extension (Item 13) and the right side
bottom elbow and extension (Item 14).
14. Attach quick switch brackets (Item 31) onto items 14 and 13.
15.
Slide middle main frame (Item 15) onto items 13 and 14 assembled in step 13 and lock together.
Lubricate frame bars for best operation as shown in step 11.