2.6 REFILLING
Motor installed in the machine is of the type with lubrication for life; no action of checking/
replacing or topping up is necessary.
Gas filling necessary to the freezing system is carried out at OTT FREEZER works during machine
postproduction testing.
If a gas addition happens to be made, this must be carried out by skilled technicans, only, who
can also find out trouble origin.
2.7 MACHINE TESTING
A postproduction test of the machine is carried out at Ott freezer premises; Operation and output
functionality of the machine are thoroughly tested.
Machine test at end user's must be carried out by skilled technicians or by one of OTT FREEZER
engineers.
After the machine positioning and correct connections, also carry out all operations necessary
to functional check and test of the machine.
2.8 MOVEMENT - TRANSPORT
Should the machine need be moved from its original location, it is necessary to turn to skilled
personnel.