![background image](http://html1.mh-extra.com/html/oster/fpstje4000r/fpstje4000r_instruction-manual_1657519022.webp)
English-5
PRESS JUICER ASSEMBLY IN DETAIL
Step 1.
Firmly insert the extraction seal located at the bottom of the chamber into the
pulp outlet. Make sure the outer groove of the chamber is completely aligned
with the base ridge. Then turn the chamber clockwise to secure it to the base.
Steps 2,3.
Assemble the parts in the following order: chamber (1) > spinning brush (2) >
strainer (3) > auger (4) > hopper (5). (Or assemble the spinning brush into the
chamber. then fit the strainer projection into the chamber inner groove). Make sure
the arrow
[
]
of the strainer aligns with the arrow
[
]
at the top of the base.
Step 4.
Make sure the lock symbol [ ] on the hopper is aligned with the arrow [
]
mark on the top of the base.
Strainer
[
]
Base [
]
Chamber outer groove
Base ridge
Extraction
seal
Hopper(5)
Auger(4)
Strainer(3)
Spinning
Brush(2)
Chamber(1)