INSTRUCTIONS FOR INSTALLATION 

 

We reserve the right of alternations 

 

Page 

11

 

3.3.4. Removing/fixing the front and top case 

 
 
 
 
Grasp the front case by its sides, pull it towards the 
front and remove it by lifting it off the unit, push top 
cover towards back and lift it off the unit. 

 

3.4. Plumbing & Heating installation & commissioning 

3.4.1 Installation 

On RS - M boilers fit the supplied safety valve to the heating return point on the installation– see point 12 page 4 
diagram. Ensure that no valve is placed between the safety valve and the boiler. 

To avoid draining the entire primary system during boiler maintenance it is recommended that isolation valves are 
fitted to the flow and return pipes immediately below the boiler. 
Connect the primary flow and return pipes for the central heating system to the labeled connections on the boiler.  
Connect the mains water supply via a filling loop to the charge and discharge valve on the boiler incorporating a 
stop valve and double check valve which must be left disconnected after commissioning. 
Drain  taps  must  be  located  in  accessible  positions  which  permit  the  draining  of  the  whole  system  including the 
primary and the secondary (dhw) system. 
Any water loss from the system should be replaced from the filling loop connection. 

When  draining  the  boiler  allow  air  in  using  the  boiler  venting  valve.  Do  not  drain  the  boiler  by  opening  the 
pressure relief valve. 
All capillary joints in all DHW pipework must be made with lead free solder.  
The Plus – M and PTV –  M are self contained system boilers that manage heating flow to the radiators and or 
under  floor.  The  PTV  –  E  also  supply  heat  to  a  domestic hot  water  cylinder.  External  motorized  valves are  not 
normally  required  (excepting  when  the  PTV  –  M  is  connected  to  an  Unvented  Water  Heater)  and  therefore 
systems  such  as  S  &  Y  plan  are  not  applicable.  As  motorized  valves  are  not  used  a  bypass  is  not  normally 
required. Product diagrams on pages 5 & 7 display the expansion vessel and pumps. 

Termo Plus and Termo PTV are be also be used on an open vented central heating system. 

Wherever possible all pipe work should be insulated to help prevent heat loss and possible freezing, particularly 
where pipes are run through roof spaces and ventilated under-floor spaces. 

 

3.4.2 Ancilliary components. 

On RS – M boilers a boiler pressure gauge, circulation pump and expansion vessel must be fitted. The expansion 
vessel should be sized to the total system volume. The water capacity of the boiler itself is 6 litres. 
 

 

 

Diagram of recommned pump on RS-E for radiator heating 

Diagram of recommned pump on RS-E for underfloor heating

 

All manuals and user guides at all-guides.com

Summary of Contents for TERMO PLUS-M

Page 1: ...TERMO ELECTRIC BOILERS MANUAL OSO TERMO RS M OSO TERMO PLUS M OSO TERMO PTV M B C All manuals and user guides at all guides com a l l g u i d e s c o m...

Page 2: ...All manuals and user guides at all guides com...

Page 3: ...3 4 Plumbing Heating installation commissioning 11 3 4 1 Installation 11 3 4 2 Ancilliary components 11 3 5 Connection to the electrical mains supply 12 3 6 Connecting external controls 13 3 6 1 Conne...

Page 4: ...lternations 10 3 2 Electric sketch Termo plus m 25 10 3 3 S Plan wiring layout 25 10 4 Termo PTV M 26 10 4 1 Hydraulic sketch Termo PTV m 26 10 4 2 Electric sketch Termo PTV m 26 10 4 3 S Plan wiring...

Page 5: ...er ensuring elements are constantly immersed in heating medium water with appropriate inhibitor Power is modulated automatically to control 1 2 or 3 immersion elements with built in step regulator or...

Page 6: ...upplied 2 Primary return 8 Cable entry point 14 Isolation valves not supplied 3 External boiler jacket 9 Contactors and RCD switch 15 Manual venting valve not supplied 4 Boiler 10 Charge and discharge...

Page 7: ...ECHNICAL DATA FOR TERMO RS M BOILERS Power kW Capacity Lit Dimensions mm Weight kg Maximum oprerating pressure MPa bar Connection Power supply 4 8 6 7 2 10 8 14 4 6 A 330 B 750 C 230 D 100 E 57 F 126...

Page 8: ...urn 9 Contactors 16 Air indicator 3 External boiler jacket 10 Expansion vessel 17 Manifold 4 Boiler 11 Circulation pump 18 RCD switch 5 Armaflex insulation 12 Safety valve 2 5 bar 19 Pocket with tempe...

Page 9: ...PLUS M BOILERS Power kW Boiler Capacity Litres Expansion vessel L bar Dimensions Mm Dry Weight kg Maximum primary operating pressure MPa bar Connection BSP male Power supply 4 8 6 7 2 10 8 14 4 6 8 0...

Page 10: ...iler jacket 11 Circulation pump 19 Pump for water cylinder 4 Boiler 12 Safety valve 2 5 bar 20 Primary flow for water cylinder 5 Armaflex insulation 13 Automatic air vent AAV 21 Pocket for temperature...

Page 11: ...r Capacity Litres Expansion vessel L bar Dimensions Mm Dry Weight kg Maximum primary operating pressure MPa bar Connection BSP male Power supply 4 8 6 7 2 10 8 14 4 10 10 0 8 A 400 B 930 C 230 D 150 E...

Page 12: ...r kW 8 4 0 114 14 4 10 0 4 4 0 08 0 8 0 3 3 10 5 0 50 143 14 4 Values are related to working temperature range from 10 C to 90 C 2 3 Power supply characteristics 240V POWER nominal current MCB Rated s...

Page 13: ...manner for which they are intended The guarantee is only valid if the following the following conditions are observed The boiler must be installed by a registered engineer to comply with current buil...

Page 14: ...wall using suitable plastic plugs and M8 or M10 screws not supplied Decide the position of the bottom of the boiler giving due consideration to the recommended minimum clearance and then drill holes...

Page 15: ...ld be replaced from the filling loop connection When draining the boiler allow air in using the boiler venting valve Do not drain the boiler by opening the pressure relief valve All capillary joints i...

Page 16: ...ir is detected and It exceeds the permitted level air indicator switches off immersion heaters and circulation pump remains active so that air is allowed to escape easily Once the air is dispelled the...

Page 17: ...unit L Live feed to external unit N neutral to external unit PE earth to external unit 3 switched live from external unit for DHW 4 switched live from external unit for space heating Note For more det...

Page 18: ...red light Light will illuminate red if air appears in the boiler The boiler shuts down automatically To continue operation vent the boiler When venting is completed the boiler restarts automatically...

Page 19: ...ater switch relay is faulty Does DISPLAY show temperature inside boiler NO NO YES Is the temperature of water same as desired YES Wait for boiler to heat up NO Is the room thermostat switched ON YES S...

Page 20: ...O NO Replace the operating thermostat with new YES Please check the following before going through fault finding flowchart Check the installation is correct All isolating valves are open The system is...

Page 21: ...nd controls outside of boiler are on Check the electrical supply is connected correctly and present Central heating system was not vented properly Lower the speed on central heating pump see guide bel...

Page 22: ...ct All isolating valves are open The system is full of water pressurised and purged of air Programmer and controls outside of boiler are on Check the electrical supply is connected correctly and prese...

Page 23: ...valves are open The system is full of water pressurised and purged of air Programmer and controls outside of boiler are on Check the electrical supply is connected correctly and present YES Find and...

Page 24: ...lease check the following before going through Fault finding chart Check the installation is correct All isolating valves are open The system is full of water pressurised and purged of air Programmer...

Page 25: ...eakdown A charge will be made if There is not a fault with the Termo boiler or the breakdown was caused by incorrect installation of the product that does not conform to the installation manual Compon...

Page 26: ...ilers into different central heating systems Advice is given for a variety of standard systems commonly used in the UK however the list is not exhaustive and OSO Hotwater UK Ltd cannot guarantee that...

Page 27: ...INSTRUCTIONS FOR INSTALLATION We reserve the right of alternations Page 23 10 1 3 S plan wiring layout All manuals and user guides at all guides com...

Page 28: ...reserve the right of alternations Page 24 10 2 Termo RS space heating only 10 2 1 Hydraulic diagram Termo RS M 10 2 2 Electric diagram Termo RS M 10 2 3 S Plan wiring layout Termo RS M All manuals an...

Page 29: ...TALLATION We reserve the right of alternations Page 25 10 3 Termo Plus M 10 3 1 Hydraulic sketchs Termo plus m 10 3 2 Electric sketch Termo plus m 10 3 3 S Plan wiring layout All manuals and user guid...

Page 30: ...NSTALLATION We reserve the right of alternations Page 26 10 4 Termo PTV M 10 4 1 Hydraulic sketch Termo PTV m 10 4 2 Electric sketch Termo PTV m 10 4 3 S Plan wiring layout All manuals and user guides...

Reviews: