INSTRUCTIONS FOR INSTALLATION 

 

We reserve the right of alternations 

 

Page 

10

 

3.3.1 Select position for boiler 

The  boiler  should  preferably  be  installed  on  the  lowest  point  in  relation  to  the  installation.  This  ensures  that 
elements are always immersed in water and there is no danger of burning out.  
 
When  positioning  the  boiler,  ensure  there  is 
adequate  space  surrounding  to  allow  for  pipe 
connection,  ventilation,  servicing  and  replacement 
of  components  including  the  immersion  heaters. 
Refer to diagrams below for guidance.  
Access is required to the control panel connections 
at  underside  of  the  boiler  and  the  power  supply 
connection, located at left bottom side of boiler. 
Ensure the boiler is in a location where it will not be 
affected by water drips or splashing.  

Ensure  that  ventilation  to  the  boiler  is  not  impeded 
by  towels,  linen  etc placed  very  close  to  the  boiler. 
Do not place towels or linen on top of the boiler. 
The  figure  below  shows  minimum  recommended 
clearances

 

 

 

Recommended minimal distances 

 

3.3.2 Fitting the boiler hanging bracket 

 
 

Fix  the  hanging  bracket  (see  page  9  No.  3)  to  the 
wall  using  suitable  plastic  plugs  and  M8  or  M10 
screws  (not  supplied).    Decide  the  position  of  the 
bottom of the boiler, giving due consideration to the 
recommended  minimum  clearance  and  then  drill 
holes to accept the boiler mounting plate.  
 
Screw  points  should  to  be  drilled  the  following 
distances above the bottom of the boiler casing 
 
RS – E   

624mm 

Plus – E  

610mm 

PTV – E   

625mm  

 

 

 

Wall mounting 

Note: 
If the boiler is to be fitted in a timber framed building ensure that the bracket is secured to a substantial 
part of the timber frame capable of taking the weight of the boiler. 

 

3.3.3 General recommendations when handling 

Clear  the  route  before  attempting  the  lift.  Ensure  safe  lifting  techniques  are  used  –  keep  back  straight  –  bend 
using legs. Keep load as close to body as possible. Do not twist – reposition feet instead. If 2 persons performing 
lift,  ensure  coordinated  movements  during  lift.  Avoid  upper  body/top  heavy  bending  -  do  not  lean 
forward/sideways. Recommend wear suitable cut resistant gloves with good grip to protect against sharp edges 
and ensure good grip. Always use assistance if required. 
 

Positioning of Appliance for Final Installation 

Lift up boiler (3) above hanging bracket (2), gently lean it to the wall (1) and slide it down to hanging bracket (2).  
 

All manuals and user guides at all-guides.com

Summary of Contents for TERMO PLUS-M

Page 1: ...TERMO ELECTRIC BOILERS MANUAL OSO TERMO RS M OSO TERMO PLUS M OSO TERMO PTV M B C All manuals and user guides at all guides com a l l g u i d e s c o m...

Page 2: ...All manuals and user guides at all guides com...

Page 3: ...3 4 Plumbing Heating installation commissioning 11 3 4 1 Installation 11 3 4 2 Ancilliary components 11 3 5 Connection to the electrical mains supply 12 3 6 Connecting external controls 13 3 6 1 Conne...

Page 4: ...lternations 10 3 2 Electric sketch Termo plus m 25 10 3 3 S Plan wiring layout 25 10 4 Termo PTV M 26 10 4 1 Hydraulic sketch Termo PTV m 26 10 4 2 Electric sketch Termo PTV m 26 10 4 3 S Plan wiring...

Page 5: ...er ensuring elements are constantly immersed in heating medium water with appropriate inhibitor Power is modulated automatically to control 1 2 or 3 immersion elements with built in step regulator or...

Page 6: ...upplied 2 Primary return 8 Cable entry point 14 Isolation valves not supplied 3 External boiler jacket 9 Contactors and RCD switch 15 Manual venting valve not supplied 4 Boiler 10 Charge and discharge...

Page 7: ...ECHNICAL DATA FOR TERMO RS M BOILERS Power kW Capacity Lit Dimensions mm Weight kg Maximum oprerating pressure MPa bar Connection Power supply 4 8 6 7 2 10 8 14 4 6 A 330 B 750 C 230 D 100 E 57 F 126...

Page 8: ...urn 9 Contactors 16 Air indicator 3 External boiler jacket 10 Expansion vessel 17 Manifold 4 Boiler 11 Circulation pump 18 RCD switch 5 Armaflex insulation 12 Safety valve 2 5 bar 19 Pocket with tempe...

Page 9: ...PLUS M BOILERS Power kW Boiler Capacity Litres Expansion vessel L bar Dimensions Mm Dry Weight kg Maximum primary operating pressure MPa bar Connection BSP male Power supply 4 8 6 7 2 10 8 14 4 6 8 0...

Page 10: ...iler jacket 11 Circulation pump 19 Pump for water cylinder 4 Boiler 12 Safety valve 2 5 bar 20 Primary flow for water cylinder 5 Armaflex insulation 13 Automatic air vent AAV 21 Pocket for temperature...

Page 11: ...r Capacity Litres Expansion vessel L bar Dimensions Mm Dry Weight kg Maximum primary operating pressure MPa bar Connection BSP male Power supply 4 8 6 7 2 10 8 14 4 10 10 0 8 A 400 B 930 C 230 D 150 E...

Page 12: ...r kW 8 4 0 114 14 4 10 0 4 4 0 08 0 8 0 3 3 10 5 0 50 143 14 4 Values are related to working temperature range from 10 C to 90 C 2 3 Power supply characteristics 240V POWER nominal current MCB Rated s...

Page 13: ...manner for which they are intended The guarantee is only valid if the following the following conditions are observed The boiler must be installed by a registered engineer to comply with current buil...

Page 14: ...wall using suitable plastic plugs and M8 or M10 screws not supplied Decide the position of the bottom of the boiler giving due consideration to the recommended minimum clearance and then drill holes...

Page 15: ...ld be replaced from the filling loop connection When draining the boiler allow air in using the boiler venting valve Do not drain the boiler by opening the pressure relief valve All capillary joints i...

Page 16: ...ir is detected and It exceeds the permitted level air indicator switches off immersion heaters and circulation pump remains active so that air is allowed to escape easily Once the air is dispelled the...

Page 17: ...unit L Live feed to external unit N neutral to external unit PE earth to external unit 3 switched live from external unit for DHW 4 switched live from external unit for space heating Note For more det...

Page 18: ...red light Light will illuminate red if air appears in the boiler The boiler shuts down automatically To continue operation vent the boiler When venting is completed the boiler restarts automatically...

Page 19: ...ater switch relay is faulty Does DISPLAY show temperature inside boiler NO NO YES Is the temperature of water same as desired YES Wait for boiler to heat up NO Is the room thermostat switched ON YES S...

Page 20: ...O NO Replace the operating thermostat with new YES Please check the following before going through fault finding flowchart Check the installation is correct All isolating valves are open The system is...

Page 21: ...nd controls outside of boiler are on Check the electrical supply is connected correctly and present Central heating system was not vented properly Lower the speed on central heating pump see guide bel...

Page 22: ...ct All isolating valves are open The system is full of water pressurised and purged of air Programmer and controls outside of boiler are on Check the electrical supply is connected correctly and prese...

Page 23: ...valves are open The system is full of water pressurised and purged of air Programmer and controls outside of boiler are on Check the electrical supply is connected correctly and present YES Find and...

Page 24: ...lease check the following before going through Fault finding chart Check the installation is correct All isolating valves are open The system is full of water pressurised and purged of air Programmer...

Page 25: ...eakdown A charge will be made if There is not a fault with the Termo boiler or the breakdown was caused by incorrect installation of the product that does not conform to the installation manual Compon...

Page 26: ...ilers into different central heating systems Advice is given for a variety of standard systems commonly used in the UK however the list is not exhaustive and OSO Hotwater UK Ltd cannot guarantee that...

Page 27: ...INSTRUCTIONS FOR INSTALLATION We reserve the right of alternations Page 23 10 1 3 S plan wiring layout All manuals and user guides at all guides com...

Page 28: ...reserve the right of alternations Page 24 10 2 Termo RS space heating only 10 2 1 Hydraulic diagram Termo RS M 10 2 2 Electric diagram Termo RS M 10 2 3 S Plan wiring layout Termo RS M All manuals an...

Page 29: ...TALLATION We reserve the right of alternations Page 25 10 3 Termo Plus M 10 3 1 Hydraulic sketchs Termo plus m 10 3 2 Electric sketch Termo plus m 10 3 3 S Plan wiring layout All manuals and user guid...

Page 30: ...NSTALLATION We reserve the right of alternations Page 26 10 4 Termo PTV M 10 4 1 Hydraulic sketch Termo PTV m 10 4 2 Electric sketch Termo PTV m 10 4 3 S Plan wiring layout All manuals and user guides...

Reviews: