8
3.5 Pipe installation
The product is designed to be permanently
connected to the mains water supply. Ap-
proved pipes of the correct size should be used
for installation. The relevant standards and reg-
ulations must be followed.
The efficiency of the product depends on
the incoming cold water pressure. The water
pressure should be min. 2 bar and max. 6 bar
throughout the day. Excessive water pressure
can be adjusted by installing a pressure reduc-
tion valve.
Pipes of suitable size and quality should be run
to the connections on the product and fixed
with a suitable sealant.
A safety valve (see pt. 2.3) suitable for the in-
stalled effect in accordance with current local
regulations shall be fitted in the heating circuit
(not supplied).
Connect-
ion
Dimension
Function
C
G3/4” internal
Cold water in
D
G3/4” internal
Coil connection, RETURN
E
G3/4” internal
Hot water circulation
F
G3/4” internal
Coil connection, FLOW
H
G3/4” internal
Hot water out
I
ø6 / 8 mm
Sensor slot
P
G1/2” internal
Safety valve P&T (supplied)
C
D
I
H
P
E
F
Delta Geocoil DGC 200 - Coil 2.6 m²
Flow L/hour
4500 3600 2700 1800 900
Pressure drop mBar
2100 1390 840 421 128
L/h @ 1 Bar pressure drop
3000
Delta Geocoil DGC 250 & 300 - Coil 3.1 m²
Flow L/hour
4500 3600 2700 1800 900
Pressure drop mBar
2410 1610 946 479 150
L/h @ 1 Bar pressure drop
2800