
SPB-1500
OSKAR Portable Blower
6
www.oskarsales.com
2.
When stopping operation, check if the
switch is under off status.
EARTHING WIRE
Connect yellow/green wires to the earthing
wire power jack. Confirm that the earthing
wire has been properly connected before
connecting main power cord to the machine
at all times.
Do not disconnect
the wiring jack
before cutting off power!
POWER INSTALLATION AND STORAGE
The electrical power is configured as
following. If conditions are beyond the scope
stated below, then it is required to ensure
that the power is well arranged and safe.
y
Ambient temperature: Between 41°F
and 131°F. If the time is over 24
hours, then the ambient average
temperature shall not be over 122°F.
y
Humidity: Between 30% and 95%
y
Altitude: 3,280 feet
y
Moving and Storing: -13°F to 131°F.
For short-time storage (less than 24
hours), the storage temperature can
be up to 158°F.
Operation
PRIOR TO START UP
Purpose: The blower is specially suitable for
treating the smoke generated during
ordinary welding
processing
work, which can
effectively collect the smoke, dusts and chips
resulting from the welding work in
maintaining the air quality of the working
environment.
y
Before starting the machine, be sure
to read this Manual carefully.
y
Before starting the machine, check if
relevant safety protection measures
have been taken according to the
Manual.
y
Before starting the machine, watch
the motor turning direction according
to the instruction of arrow direction.
START UP
1.
To ensure satisfactory performance for
the blower, please confirm the air
volume and power.
2.
Connect power according to electrical
installation procedure after installing the
blower. Disconnect power according to
electrical installation procedure when the
machine is not used.
T1
98
2T1
A1
1L1
R
MOTOR
T3
R
O
ManAuto
97
96
R
95
6T3
4T2
14NO
A2
17
3L2
5L3
S
T
A2
13NO
T2
Figure 2 – Electrical Circuit Diagram