SECTION 4 - MACHINE OPERATION
4-12
3121716
Battery Only Operating Mode
The machine will operate in the battery only mode when the fol-
lowing two conditions apply:
1.
Ground Control Emergency Stop Switch is
pulled out (on),
and
:
2.
The switch on the platform control console is
in the Off or Disable position.
In this mode the machine will operate as a conventional battery
operated unit. The batteries can be used until they are fully dis-
charged.
Manual (Charge) Operating Mode
The generator will operate in manual mode always when the fol-
lowing three conditions apply.
1.
Ground Control Emergency Stop Switch is
pulled out (on),
and
:
2.
The switch on the platform control console is
in the On or Enable position
and
:
3.
The Manual Charge push button is activated.
Activation of the Manual Charge button will start the engine and
initiate the charging cycle even if the batteries are charged above
the level of automatic start. The operator can initiate the charge
cycle to charge the batteries to the maximum level. The charging
cycle will include finishing phase similar to conventional char-
gers.
Summary of Contents for JLG E400A Narrow
Page 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 3121716 NOTES ...
Page 40: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 12 3121716 NOTES ...
Page 58: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 18 3121716 NOTES ...
Page 65: ...SECTION 4 MACHINE OPERATION 3121716 4 7 Figure 4 3 Grade and Side Slopes ...
Page 76: ...SECTION 4 MACHINE OPERATION 4 18 3121716 Figure 4 5 Lifting Chart ...
Page 77: ...SECTION 4 MACHINE OPERATION 3121716 4 19 Figure 4 6 Decal Installation Sheet 1 of 6 ...
Page 78: ...SECTION 4 MACHINE OPERATION 4 20 3121716 Figure 4 7 Decal Installation Sheet 2 of 6 ...
Page 79: ...SECTION 4 MACHINE OPERATION 3121716 4 21 Figure 4 8 Decal Installation Sheet 3 of 6 ...
Page 80: ...SECTION 4 MACHINE OPERATION 4 22 3121716 Figure 4 9 Decal Installation Sheet 4 of 6 ...
Page 81: ...SECTION 4 MACHINE OPERATION 3121716 4 23 Figure 4 10 Decal Installation Sheet 5 of 6 ...
Page 82: ...SECTION 4 MACHINE OPERATION 4 24 3121716 Figure 4 11 Decal Installation Sheet 6 of 6 ...
Page 94: ...SECTION 4 MACHINE OPERATION 4 36 3121716 NOTES ...
Page 98: ...SECTION 5 EMERGENCY PROCEDURES 5 4 3121716 NOTES ...
Page 102: ...SECTION 6 ACCESSORIES 6 4 3121716 NOTES ...
Page 127: ......