SECTION 3 - MACHINE CONTROLS AND INDICATORS
3121716
3-5
10.
Circuit Breakers
The circuit breakers open (pop out) to indicate a short or
overload somewhere on the machine.
11.
Power/Emergency Stop Switch
A two-position red mushroom shaped switch
furnishes power to Platform/Ground Select
switch when pulled out (on). When pushed in
(off ), power is shut off to the Platform/Ground Select switch.
12.
Platform/Ground Select Switch
A three position, key operated switch
supplies power to the platform control
console when positioned to Platform.
With the switch key in the Ground posi-
tion, power is shut off to platform and
only ground controls are operable.
NOTE:
With Platform/Ground Select switch in the center position,
power is shut off to controls at both operating stations.
13.
Lower/Mid Boom Lift
Provides for raising and lowering of
Lower Boom when positioned to Up or
Down.
14.
Upper Boom Lift
Provides for raising and lowering of Upper
Boom when positioned to Up or Down.
15.
Jib (If equipped)
The Jib control switch provides raising and
lowering of the jib when positioned up or
down.
Summary of Contents for JLG E400A Narrow
Page 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 3121716 NOTES ...
Page 40: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 12 3121716 NOTES ...
Page 58: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 18 3121716 NOTES ...
Page 65: ...SECTION 4 MACHINE OPERATION 3121716 4 7 Figure 4 3 Grade and Side Slopes ...
Page 76: ...SECTION 4 MACHINE OPERATION 4 18 3121716 Figure 4 5 Lifting Chart ...
Page 77: ...SECTION 4 MACHINE OPERATION 3121716 4 19 Figure 4 6 Decal Installation Sheet 1 of 6 ...
Page 78: ...SECTION 4 MACHINE OPERATION 4 20 3121716 Figure 4 7 Decal Installation Sheet 2 of 6 ...
Page 79: ...SECTION 4 MACHINE OPERATION 3121716 4 21 Figure 4 8 Decal Installation Sheet 3 of 6 ...
Page 80: ...SECTION 4 MACHINE OPERATION 4 22 3121716 Figure 4 9 Decal Installation Sheet 4 of 6 ...
Page 81: ...SECTION 4 MACHINE OPERATION 3121716 4 23 Figure 4 10 Decal Installation Sheet 5 of 6 ...
Page 82: ...SECTION 4 MACHINE OPERATION 4 24 3121716 Figure 4 11 Decal Installation Sheet 6 of 6 ...
Page 94: ...SECTION 4 MACHINE OPERATION 4 36 3121716 NOTES ...
Page 98: ...SECTION 5 EMERGENCY PROCEDURES 5 4 3121716 NOTES ...
Page 102: ...SECTION 6 ACCESSORIES 6 4 3121716 NOTES ...
Page 127: ......