SECTION 6 - ACCESSORIES
3121716
6-3
Preparation and Inspection
• Ensure racks are secured to the platform rails.
• Replace torn or frayed tie-down straps.
Operation
1.
To prepare racks for loading, remove locking pins, rotate
each rack 90 degrees from stowed to working position, then
secure with locking pins.
2.
Loosen and remove tie-down straps. Place material on racks
with weight evenly distributed between both racks.
3.
Route the tie-down straps at each end across loaded mate-
rial and tighten.
4.
To remove material, loosen and remove tie-down straps,
then carefully remove material from racks.
NOTE:
Reinstall tie-down straps across any remaining material before
continuing machine operations.
Summary of Contents for JLG E400A Narrow
Page 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 3121716 NOTES ...
Page 40: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 12 3121716 NOTES ...
Page 58: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 18 3121716 NOTES ...
Page 65: ...SECTION 4 MACHINE OPERATION 3121716 4 7 Figure 4 3 Grade and Side Slopes ...
Page 76: ...SECTION 4 MACHINE OPERATION 4 18 3121716 Figure 4 5 Lifting Chart ...
Page 77: ...SECTION 4 MACHINE OPERATION 3121716 4 19 Figure 4 6 Decal Installation Sheet 1 of 6 ...
Page 78: ...SECTION 4 MACHINE OPERATION 4 20 3121716 Figure 4 7 Decal Installation Sheet 2 of 6 ...
Page 79: ...SECTION 4 MACHINE OPERATION 3121716 4 21 Figure 4 8 Decal Installation Sheet 3 of 6 ...
Page 80: ...SECTION 4 MACHINE OPERATION 4 22 3121716 Figure 4 9 Decal Installation Sheet 4 of 6 ...
Page 81: ...SECTION 4 MACHINE OPERATION 3121716 4 23 Figure 4 10 Decal Installation Sheet 5 of 6 ...
Page 82: ...SECTION 4 MACHINE OPERATION 4 24 3121716 Figure 4 11 Decal Installation Sheet 6 of 6 ...
Page 94: ...SECTION 4 MACHINE OPERATION 4 36 3121716 NOTES ...
Page 98: ...SECTION 5 EMERGENCY PROCEDURES 5 4 3121716 NOTES ...
Page 102: ...SECTION 6 ACCESSORIES 6 4 3121716 NOTES ...
Page 127: ......