SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
3121769
– JLG Lift –
2-11
2.3
FUNCTION CHECK
From the Ground Control Console with No Load in the
Platform:
1.
Ensure that all function controls and switches return to the
"off" or neutral position when released.
2.
Operate all functions and ensure proper operation.
3.
Test the tower boom assembly sequencing as follows:
a.
Place machine on level ground with the tower boom
assembly in the stowed position. Identify the tower
boom vertical limit switch adjacent to the tower lift cyl
-
inder at the bottom end (rear) of the tower base boom.
Open the left side hood and perform a visual check that
the plunger on the tower boom vertical limit switch is
fully extended. The plunger is shown fully extended in
Figure 2-5.
Figure 2-5. Tower Boom Vertical Limit Switch
Summary of Contents for JLG H800AJ
Page 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 JLG Lift 3121769 NOTES ...
Page 37: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 3121769 JLG Lift 2 9 ...
Page 48: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 20 JLG Lift 3121769 ...
Page 72: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 24 JLG Lift 3121769 NOTES ...
Page 94: ...SECTION 4 MACHINE OPERATION 4 22 JLG Lift 3121769 Figure 4 7 Tow Bar ...
Page 120: ...SECTION 4 MACHINE OPERATION 4 48 JLG Lift 3121769 ...
Page 124: ...SECTION 5 EMERGENCY PROCEDURES 5 4 JLG Lift 3121769 ...
Page 158: ...SECTION 7 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 7 22 JLG Lift 3121769 NOTES ...
Page 162: ......
Page 163: ......