SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
3121217
– JLG Lift –
6-15
3.
The tightening of the nuts should be done in stages. Fol-
lowing the recommended sequence, tighten nuts per
wheel torque chart.
4.
Wheel nuts should be torqued after first 50 hours of
operation and after each wheel removal. Check torque
every 3 months or 150 hours of operation.
6.6
SUPPLEMENTAL INFORMATION
The following information is provided in accordance with the
requirements of the European Machinery Directive 2006/42/
EC and is only applicable to CE machines.
For electric powered machines, the equivalent continuous A-
Weighted sound pressure level at the work platform is less
than 70dB(A)
For combustion engine powered machines, guaranteed
Sound Power Level (LWA) per European Directive 2000/14/
EC (Noise Emission in the Environment by Equipment for
Use Outdoors) based on test methods in accordance with
Annex III, Part B, Method 1 and 0 of the directive, is 104 dB.
The vibration total value to which the hand-arm system is
subjected does not exceed 2,5 m/s
2
. The highest root mean
square value of weighted acceleration to which the whole
body is subjected does not exceed 0,5 m/s
2
.
Table 6-9. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
2nd Stage
3rd Stage
40 ft. lbs.
(55 Nm)
100 ft. lbs.
(130 Nm)
170 ft. lbs.
(255 Nm)
www.
duma
-rent.com