SECTION 4 - MACHINE OPERATION
3121217
– JLG Lift –
4-9
4.9
FUNCTION SPEED CONTROL
This control affects the speed of all boom functions and Plat-
form Rotate. When in the CCW maximum position, Drive is
placed in creep speed.
4.10 OSCILLATING AXLE LOCKOUT TEST (IF
EQUIPPED)
LOCKOUT SYSTEM TEST MUST BE PERFORMED QUARTERLY, ANY
TIME A SYSTEM COMPONENT IS REPLACED, OR WHEN IMPROPER
SYSTEM OPERATION IS SUSPECTED.
Refer to Section 6.4, Oscillating Axle Lockout Test (If
Equipped) for procedure.
4.11 SHUT DOWN AND PARK
NOTE:
When parking overnight, batteries should be charged
properly to ensure readiness for following workday.
NOTE:
Electric machines are equipped with a static strap due to
static electricity build-ups. Strap is located under rear of
machine chassis.
To shut down and park the machine, the procedures are as
follows:
1.
Drive machine to a reasonably well protected area.
2.
Ensure boom is lowered over rear drive axle.
3.
Push in the Emergency Stop at Platform Controls.
4.
Push in the Emergency Stop at Ground Controls. Posi-
tion Platform/Ground Select switch to center OFF.
5.
If necessary, cover Platform Controls to protect instruc-
tion placards, warning decals and operating controls
from hostile environment.
www.
duma
-rent.com