Section 6 - Emergency Procedures
6-2
31200205
6.2
EMERGENCY LOWERING OF BOOM
In the event of total loss of engine power or hydraulic pump failure with an elevated
load, the situation must be properly evaluated and dealt with on an individual basis.
Contact JLG Industries or the local Authorized Distributor for specific
instructions.
Secure the telehandler using the following procedures:
1. Clear the area around telehandler of all personnel.
2. Apply the parking brake. Place the transmission control lever in “NEUTRAL”.
3. Block all four wheels.
4. Section off a large area under the boom with string or tape to restrict any
personnel from entering this area.
Summary of Contents for JLG 3508PS
Page 2: ......
Page 26: ...Section 1 General Safety Practices 1 14 31200205 This Page Intentionally Left Blank...
Page 45: ...Section 3 Controls and Indicators 3 9 31200205 This Page Intentionally Left Blank...
Page 68: ...Section 3 Controls and Indicators 3 32 31200205 This Page Intentionally Left Blank...
Page 85: ...Section 5 Attachments and Hitches 5 5 31200205 This Page Intentionally Left Blank...
Page 139: ...Section 7 Lubrication and Maintenance 7 7 31200205 17M OZ2430 EVERY 8...
Page 141: ...Section 7 Lubrication and Maintenance 7 9 31200205 17M OZ2440 2X 50 EVERY...
Page 160: ...Section 8 Additional Checks 8 6 31200205 This Page Intentionally Left Blank...
Page 174: ...Inspection Maintenance and Repair Log Date Comments...
Page 176: ......
Page 177: ......