-
26
-
2.4 Fittings
2.4.1 Cooling water fitting
The cooling water input and output has a
G1/4“-internal thread and a G3/8“-external thread.
The maximum cooling water pressure is 15 bar (271 psi).
While connecting the hoses keep inclined the Cooling Jacket at an angle of approx. 45° to
avoid air bubbles.
2.4.2 Air purge collar
Use oil-free, technically clean air only.
The needed amount of air (at least 120 l/ min., 5-8 bar) depends on the application and the
installation conditions on-site.
The air purge collar has a
G1/4“-internal thread and a G3/8“-external thread.
The lens must be kept clean at all times from dust, smoke, fumes and other contaminants in order to avoid
reading errors. These effects can be reduced by using an air purge collar.
Summary of Contents for CoolingJacket Advanced
Page 18: ...18 Figure 4 CoolingJacket Advanced standard version top view...
Page 19: ...Technical Data 19 Figure 5 CoolingJacket Advanced standard version front view...
Page 20: ...20 Figure 6 CoolingJacket Advanced standard version complete view...
Page 21: ...Technical Data 21 Extended version Figure 7 CoolingJacket Advanced extended version side view...
Page 22: ...22 Figure 8 CoolingJacket Advanced extended version top view...
Page 23: ...Technical Data 23 Figure 9 CoolingJacket Advanced extended version front view...
Page 24: ...24 Figure 10 CoolingJacket Advanced extended version complete view...
Page 28: ...28 2 4 3 Cable glands on the back Figure 12 Cable glands with seal insert...
Page 34: ...34 Figure 15 Assembling of the 6 9 23 26 29 33 39 41 53 72 and 80 optics...
Page 35: ...Installation 35 Figure 16 Assembling of the 13 and 15 optics...
Page 36: ...36 Figure 17 Assembling of the 60 and 90 optics...
Page 37: ...Installation 37 3 2 2 Assembling of the front part Figure 18 Assembling of the PI 2xx...
Page 38: ...38 Figure 19 Assembling of the PI 1M 05M...
Page 39: ...Installation 39 Figure 20 Assembling of the CTlaser CSlaser CTvideo CSvideo...
Page 46: ...46 Figure 26 Back side of the CoolingJacket with locking lever 1 Locking lever...
Page 47: ...Installation 47 7 Dismount in reverse order Figure 27 Unlocking of the hinge...
Page 55: ...Installation 55 Figure 35 Notch to fix the PI Netbox top view 1 Notch...
Page 67: ......
Page 68: ...optris CJA MA E2017 08 A...