Addres:A-14,Haide Building,the Intersection of Nanxin Road and Haide Second Road
Nanshan District,Shenzhen,P.R.China
Tell:0086-755-26400198/0086-0755-26400288 Fax:0086-755-26411001
8 + 2SFP Port 10/100/1000Mbps Managed Ethernet Switch
Chapter 2 Installing and Connecting the Switch
This part describes how to install your Web Smart Ethernet Switch and make connections
to it. Please read the following topics and perform the procedures in the order being
presented.
2.1 Installation
Please follow the following instructions in avoid of incorrect installation causing device
damage and security threat.
Put the Switch on stable place or desktop in case of falling damage.
Make sure the Switch works in the proper AC input range and matches the voltage
labeled on the Switch.
To keep the Switch free from lightning, do not open the Switch’s shell even in power
failure.
Make sure that there is proper heat dissipation from and adequate ventilation around
the Switch.
Make sure the cabinet to enough back up the weight of the Switch and its
accessories.
2.1.1 Desktop Installation
Sometimes users are not equipped with the 11-inch standard cabinet. So when installing
the Switch on a desktop, please attach these cushioning rubber feet provided on the
bottom at each corner of the Switch in case of the external vibration. Allow adequate
space for ventilation between the device and the objects around it.
2.1.2 Rack-mountable Installation in 11-inch Cabinet
The Switch can be mounted in an EIA standard-sized, 11-inch rack, which can be placed
in a wiring closet with other equipment. To install the Switch, please follow these steps:
a. a
ttach the mounting brackets on the Switch’s side panels (one on each side) and
secure them with the screws provided.
Figure 4 - Bracket Installation
b. use the screws provided with the equipment rack to mount the Switch on the rack and
tighten it.