Machine substructure
Version 1.0 dated 2019-09-04
Page 9
Translation of the original instructions
MST1
GB
machine-
base_3
44040
9_G
B.f
m
OPTIMUM
M A S C H I N E N - G E R M A N Y
®
For machines with transverse forces greater than max. 0.5 kN, machine shoes e.g. SEU1 must
be used. Therefore, place the machine as far down as possible on the levelling nuts.
Lift the machine with suitable lifting gear so that the SE55 or SE85 elements can be pushed
underneath. Insert the levelling screw (1) without the lower large levelling nut (2) from above
into the through hole of the machine foot. Then screw the levelling nut (2) onto the levelling
screw from below. Adjust the levelling screw with the levelling nut until it stands up in the spher-
ical holder of the levelling disc (3). The screw must be vertical in the through hole. Carry out
these preparations at all support points, and now carefully lower the machine further and level it
via the levelling nut by holding it against the upper hexagon or lower two-edge of the levelling
screw. After levelling, screw the upper lock nut (4) with washer onto the levelling screw and
tighten. The lock nut can also be fitted underneath the levelling nut if the height is not a decisive
factor. A levelling screw (threaded rod) M16 in 300mm length incl. nut M16 with the article no.
3352988 is optionally available. The levelling screw M16 is suitable for both elements SE55 and
SE85.
Note: The machine base stands on the levelling nut (2) and not on the levelling disc with vibra-
tion damper (3).
SE55
SE85
maximum load per element
600 kg
1500 kg
Levelling screw (threaded rod)
M12x1 x 150mm
M16x2 x 150mm
Vibration damper
Ø 47mm
Ø 83 mm
2
4
3
1
SE85
SE55
2
4
3
1