background image

Installation 

Important: Please keep the installation procedure below. Improper or no 
operation may result if the start-up sequence is not correctly followed. 

Step 1 

Carefully unpack the contents in the shipping group. 

Step 2 

Power  on  the  DisplayPort  source  and  display.  Both  the  transmitter  and 
receiver will be turned on by 3.3V from pin #20 of DisplayPort interface. The 
USB  power  is  recommended  for  the  stable  power  supply  for  both  the 
transmitter and receiver.  

Step 3 

The Power LED will be turned on when DPFX-250-TR is connected to 
DisplayPort interface of signal source and display and the Status LED will 
blink three (3) times. Then the Status LED will blink again when the whole 
connection is made.  

 

Figure 2 

– Position of the LED 

Step 4 

Connect two (2) LC optical fibers between the transmitter and the receiver 
and each fiber channel shall be connected as (A) to (A) and (B) to (B) 
carefully. Ensure the duplex connectors are fully engaged and then, the top 
LED will begin to blink regularly. 

 

 

Figure 3 

– Fiber Numbering on product label 

 

1-3 Installation

 

Note1:

 Please DO NOT look directly into the LC receptacles of the 

Transmitter when it is powered on. Although this product is regulated strictly 
enough to operate under the LASER Class I, classified by CDRH/FDA for eye 
safety, it is not recommended to do so. 

Note2:

 The maximum extension length by OM3 fiber is 200 meters (656ft.). 

Note3:

 It is recommended NOT to use any intermediate cable or adapter 

between them to avoid undesirable performance degradation. 

 

Fig Figure 4 

– Connection of optical fiber 

 

Step 5 

Connect the transmitter to the DisplayPort source 

Step 6 

Connect the receiver to the DisplayPort source. 

Note:

 If the connectors are fully engaged, the bottom LED will turn on. 

Step 7 

If the system does not work properly, go to the page 1-6 for trouble shooting. 
 
 
 
 

 
 

 

1-4 Installation

 

Position of the LED 

 

Reviews: