(5)
1.Initial start up procedure:
Make sure all the loads connected to the UPS are switched off. Turn on Switch S1, S2 and turn
off S3 in sequence. Then turn off S4 fuse switch in the UPS. Press the “ON” button on the LCD
panel and a screen for confirming setting appears. Press “ ENTER” button. A message “Setting
complete” on the screen appears in a few seconds to indicate setting is successful. At that time the
system will detect the battery for 30 seconds and then the UPS will transfer from Bypass mode to
Inverter mode. Measure the output voltage and frequency on terminal R, S, T to see if the reading
is correct. Measure the voltage on terminal B+ and B- to see if the voltage is 410VDC. Please
follow operating steps as shown in (fig. 5-1-1).
Summary of Contents for DS-C33 100K
Page 1: ......
Page 7: ...Drawings 2 2C and 2 2D are the assembly diagrams of DS C33 series 45K 60K 80K Fig 2 2C ...
Page 8: ...Fig 2 2D ...
Page 9: ...Drawings 2 2E and 2 2F are the assembly diagrams of DS C33 series 22 5K 30K Fig 2 2E ...
Page 10: ...Fig 2 2F ...
Page 11: ...Drawings 2 2G and 2 2H are assembly diagrams of DS C33 series 10K 15K Fig 2 2G ...
Page 12: ...Fig 2 2H ...
Page 28: ...TIME SET DATE 200 TIME F 1 Date Time Set Y M D 200 H M S Succeed ...
Page 38: ...Fig 5 1 1 ...
Page 40: ...Fig 5 3 ...