2.6.4. Fully de-energizing AC power (plug-in machines)
A power cord lockout device (shown in
) is required for
this procedure.
To safely de-energize the Sure Sort AC Distribution enclosure, the incoming
power must be shut off by disconnecting and locking out the machine’s power
cord from the customer’s AC receptacle. An Authorized Employee or qualified
electrician must proceed as follows:
1.
“LOTO - Machine maintenance and repair” on
2.
Disconnect the AC main power cord from the receptacle.
3.
Install the OPEX lockout device over the AC plug as follows (refer to
a.
Place the AC plug inside the device and close the device. Slide the two
halves of the device as directed on the cover to lock them together
(refer to the arrows and labels on the device).
b.
Install the padlock through the loop on the lockout device. Keep the
padlock key
on your person
at all times while working on the machine.
Additional holes in the lockout device allow for multiple padlocks to be
installed.
WARNING
Only an Authorized Employee or qualified electrician is permitted to perform
this procedure.
Summary of Contents for Sure Sort
Page 167: ...84 Sécurité Sure Sort Manuel de l opérateur OPEX Corporation Page laissée volontairement vide ...
Page 168: ...84 Safety Sure Sort Operator Manual OPEX Corporation Page intentionally blank ...
Page 316: ...158 Statistics Sure Sort Operator Manual OPEX Corporation Page intentionally blank ...
Page 318: ...Sure Sort Operator Manual G Glossary G 1 List of Acronyms 160 G 2 List of Terms 160 ...
Page 331: ...166 Sure Sort Manuel de l opérateur OPEX Corporation ...
Page 332: ...166 Sure Sort Operator Manual OPEX Corporation ...