![Opera SR366 Quick Start Manual Download Page 8](http://html1.mh-extra.com/html/opera/sr366/sr366_quick-start-manual_1640184008.webp)
7
6. Mattress and Power Unit
Installations
6.1 Remove Existing Mattress
Remove existing mattress from bed frame.
6.2 Secure Mattress Replacement
Place mattress replacement on the bed frame with the foot symbol at foot end. Secure
the mattress at each side using anchor straps. Ensure that the anchor straps do not
interfere with any moving parts of the bed frame before proceeding to the next step.
6.3 Secure Power Unit
Secure the power unit onto the foot board using hanging hooks.
6.4 Connect Hose Couplers
Firmly connect the air hose couplers to the couplers on the power unit.
6.5 Check CPR Pull Cord
Unzip mattress cover and inspect CPR latch is fully inserted into socket. It should
when re- installing the mattress.
6.6 Power Up Unit
Plug the power unit into an electrical outlet, and turn on the main power rocker
switch on the right side of the power unit.
for approx. 30 seconds until the power unit is ready before making any program
adjustment.
6.7
patient to lie down on the mattress.
6.8 Ensure patient comfort
the patient for long periods of time.
Impulse Auto Mattress Instructions and Technical Specification