Opera SR366 Quick Start Manual Download Page 11

10

12. Troubleshooting

Fault

Inspection Procedure

Remedy

Power unit is not 

working.

plugged into both the control 

unit and the electrical outlet.

Secure power cord set into control unit 

and/or electrical outlet.

Check if the power switch is in 

the ON position.

Turn power switch to ON position.

Check if power surge has shut 

down the power unit.

A power surge may overload the 

circuitry temporarily. Turn the unit 

off, and check the fuse for damage. 

Turn the unit on again with normal 

procedure.

Make sure there is no power 

failure.

Turn on and operate the unit after 

power is restored to the facility or 

home.

Power unit does not respond 

to possible solutions.

Please contact 

for assistance.

Low pressure alert 

does not go out in 30 

sec. after systems 

start.

Possible control failure.

Alert LED is lit during 

operation.

Check if there is leakage in air 

tubes* or air cells.

Power unit is working, 

but mattress 

replacement is not 

and/or

Bottoming out is 

occurring

and/or

Patient leaves a deep 

indentation at the 

contact area which 

does not return back 

to its original shape.

Check CPR Pull Cord

Unzip mattress cover and inspect 

CPR latch is fully inserted into socket

Check if mattress’ air hose 

couplers are properly 

connected to power unit’s 

quick release couplers.

place.

Verify that patient comfort 

setting is correct.

Increase or decrease comfort setting 

until appropriate pressure is reached.

Lift mattress coverlet up to 

check if air cells are connected 

correctly.

Make sure all air cells are properly 

linked to air supply.

Lift mattress coverlet up to 

check if air tubes are kinked or 

obstructed.

Check and adjust air tubes’ positions.

Check if air cells are cut or 

cracked.

Impulse Auto Mattress Instructions and Technical Specification

0333 222 8584

Please contact Opera 

for assistance.

Care on 

0333 222 8584

Please contact Opera 

for assistance.

Care on 

0333 222 8584

Opera Care on

Summary of Contents for SR366

Page 1: ...Instructions and for Opera Impulse Auto Hybrid Mattress System Opera Care Azure House Connaught Road Hull HU7 3AP 0333 222 8584 support opera care co uk opera care co uk IMPULSE AUTO...

Page 2: ...Thank you for purchasing this anti decubitus mattress replacement system PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE SETTING UP AND USING THE DEVICE Pay special attention to the warnings and other...

Page 3: ...atient group Contraindications Certain patient conditions are not suitable for using this type of device such as fracture of instable vertebrae and illness of instable vertebrae Always consult a physi...

Page 4: ...y between patients in order to avoid cross contamination 2 5 Weight Capacity Verify that the patient s weight accessories and this mattress replacement system do not exceed the bed frame s manufacture...

Page 5: ...mattress as these could puncture the air cells 3 9 Storage and Transport Do not fold or bend Not more than two layers should be stacked on top of each other For long term storage the power unit shoul...

Page 6: ...unit features an integrated pressure senor which can monitor the mattress internal pressure to achieve optimal internal pressure and to ensure maximum pressure relief This LED indicates the system is...

Page 7: ...hooks are designed to hang the power unit on almost any foot board 9 8 11 10 9 Convenient Handle The handle provides additional gripping surface for user to carry the power unit 10 Fuse Fuse Holder 11...

Page 8: ...rd using hanging hooks 6 4 Connect Hose Couplers Firmly connect the air hose couplers to the couplers on the power unit 6 5 Check CPR Pull Cord Unzip mattress cover and inspect CPR latch is fully inse...

Page 9: ...8 Patient Transfer and Transport 8 1 Transfer processor To do this increase the comfort setting to 2 Make sure the bed is secured before proceeding 8 2 Transport In the event of a patient transport t...

Page 10: ...coverlet and the mattress Any appropriate NON PHENOLIC cleaning agent may be used for heavy and coverlet are completely dry before letting the patient lie on the surface again The recommended wash tem...

Page 11: ...in air tubes or air cells Powerunit is working but mattress replacement is not and or Bottoming out is occurring and or Patient leaves a deep indentation at the contact area which does not return back...

Page 12: ...r has been attempted by any person or agency not authorised by our company or if in the sole opinion of our company that the system shows evidence of tampering abnormal or unreasonable in the instruct...

Page 13: ...ansport Storage Conditions NiMH Battery 3 6Vdc 600mAh Maximum Weight Capacity 250kg Power Unit Air Pump Model SR366 Power Unit Plastic Case_UL 94V 0 Temperature 25 C to 70 C Humidity 0 to 90 IEC EN Te...

Page 14: ...cations equipment Rated maximum output power of transmitter W Separation distance according to frequency of transmitter m 150 kHz to 80 MHz d 1 5 3 V P 80 MHz to 800 MHz d 1 5 3 E P 800 MHz to 2 5 GHz...

Page 15: ...p system is intended for use in the electromagnetic environment specified below The customer or the user of the Air Pump system should assure that it is used in such an environment Immunity test IEC 6...

Page 16: ...U 2S2205 30631 G V1 2 Opera Care Azure House Connaught Road Hull HU7 3AP 0333 222 8584 support opera care co uk opera care co uk...

Reviews: