
9 | Opera Beds | Opera Impulse Hybrid Mattress System Instructions and Technical Specifications | Version 2
6. Mattress and Power Unit Installations
6.1 Remove Existing Mattress
Place mattress replacement on the bed frame with the foot symbol at foot
end. Secure the mattress at each side using anchor straps. Ensure that the
anchor straps do not interfere with any moving parts of the bed frame before
proceeding to the next step.
6.3 Secure Power Unit
Secure the power unit on to the foot board using hanging hooks.
6.4 Connect Hose Couplers
Firmly connect the air hose couplers to the couplers on the power unit.
Remove existing mattress from the bed frame.
6.2 Secure Mattress Replacement
6.6 Power Up Unit
Plug the power unit into an electrical outlet, and turn on the main power rocker
switch on the right side of the power unit.
Press power button on the control panel to inflate the mattress system. Please
wait for approx. 30 seconds until the power unit is ready before making any
program adjustment.
6.5 Check CPR Pull Cord
Unzip mattress cover and inspect CPR latch is fully inserted into the socket. It
should arrive fully inserted when first purchased, but it is worthwhile checking,
especially when re-installing the mattress.