
3.
While still holding down the ADMIN button, reconnect the power, and continue
to hold the button for another 15 seconds. If resetting a Controller Board, you
should see two POWER LEDs light up in the top left corner.
4. Wait 15 minutes before
PROVISIONING THE ACU
Figure 22 : ADMIN button on Controller Board (left) and Core Board (right)
PROVISIONING THE ACU
Provisioning the ACU means registering it in the Control Center and getting it up and
running with the latest firmware. You will need to re-provision in the case of
RESETTING THE ACU
.
Note: If you’re provisioning ACUs for a customer account, the customer org will need
to be created by Openpath first.
REQUIREMENTS
●
Meet all
NETWORK REQUIREMENTS
●
Connect the ACU to the Internet via Ethernet
●
Install the Open Admin app
○
iOS App Store
○
Google Play Store
Version 1.8
©
Openpath 2020
Page 29
All manuals and user guides at all-guides.com