Oneida Air Systems
6
Assembly Instructions
Turn Cyclone (A) upside-down. Place Gasket (B) on the
base of Cyclone and align all the holes. Place the topside of
the Lid (E) against Gasket and align all the holes. Secure
Cyclone, Gasket and Lid together using six Bolts (C1), six
Washers (C2), and six Whiz-Lock Nuts (C3) as shown in
[FIG. 1].
Note: Tighten hardware evenly to eliminate air leaks. DO
NOT OVERTIGHTEN!
1
FIG. 1
C1
C2
B
C3
You will need the following:
•
Power Drill
•
5/16", 1/4" Drill Bits
•
1/2" Open End Wrench
•
7/16" Open End Wrench
•
Wet/Dry Vacuum
•
Vacuum hose adapters
E