15
Step 4
Install the fire bowl (6) and front table supports(13) to the legs using 4pcs screws (D)
& 4pcs screws (E) and 8pcs M6 nuts (H).and 6pcs washers (N).
Assemble the joint of the support & fire bowl using 2 pcs screw (M) and 4 pcs M4 nuts (L).
Step 5
Install the ash receiver linker (16) to
the bottom of the fire bowl (6) using 4
pcs screws (A) and 4pcs nuts ( H).
Attach the ash receiver to the linker.