![background image](http://html1.mh-extra.com/html/omron/cx-one-brochure-1/cx-one-brochure-1_brochure_744188003.webp)
Integrated simulation can now be
started from the CX-Programmer!
4
5
Integrated simulation can be started
from either the CX-Programmer or the
CX-Designer. This enables more easily
performing integrated simulation and
debugging.
Now, system errors can be easily
checked using only a computer!
Operation of monitoring
programming when errors occur can
be verified on a computer.
Saving operations in CSV files when
errors occur simplifies making test
reports.
Now, variable data can be easily
copied from the CX-Designer to
the CX-Programmer.
Variable data can be easily shared.
No work is required to manage data
allocations.
Comments can also be copied.
Integrated Simulation for Greater Design and Deb ugging Efficiency
Even Easier Integrated Simulations!
Greatly Improved Design Efficiency!
The CX-One is even easier to use through the addition of functions from CX-One version 2.0,
such as starting simulation from the CX-Programmer and customizing test screens.
A New PLC Error Simulator Enables Easily Checking
Operation of Debugged Programs When System Errors Occur!
The coverage of integrated simulation has been further expanded by enabling generation of PLC system errors on the computer, thus
eliminating the need to use actual equipment. This allows the user, for example, to easily debug programming that handles system errors.
Variable data can be easily shared between
the CX-Programmer and CX-Designer!
The ability to easily copy and paste CX-Designer variable data to the CX-Programmer further improves the efficiency of integrated simulation.
For example, variables that have been changed due to revisions in touch panel screens can be easily updated in the CX-Programmer.
1
2
3
Position OK!
Starting from the CX-Programmer
Starting from the CX-Designer
Starting Integrated Simulation
PLC Error Simulator
Sharing Variable Data
Version
Upgrade
Version
Upgrade
Integrated Simulation between PLCs and Touch Panels
1 Start integrated simulation with
the press of a button.
1 Start integrated simulation with
the press of a button.
2 Select the CX-Designer file.
2 Select the CX-Programmer file.
3 Click the Start Button.
3 Click the Start Button.
During simulation, it is
possible to change the
touch panel display
position, pin the screen
display on top, and
specify the size.
Variable names
Addresses
Comments
Variable names
Addresses
Comments
New adjustment functions enable
customizing the debugging environment!
The size of the PT screen can be changed.
The PT screens can be kept displayed in front.
The PT screen position can be saved.
Startup has been
completed!
NEW
NEW!
CX-Programmer Support
Software for PLCs
CX-Designer Screen Designing
Software for NS-series PT
Touch Panels
Integrated simulation could be started
only from the CX-Designer, even though
starting from the CX-Programmer
would sometimes be more convenient.
There was also the need to customize
screen positioning and other factors in
the debugging environment, and to
keep the PT screens displayed in front.
Previously, error-handling programming
was verified by generating errors using
error-generation commands in a
program running on the PLC.
Preparation and execution required too
much time.
Previously, it was possible to copy and
paste from the CX-Programmer to the
CX-Designer, but not in the opposite
direction. It was a lot of trouble to bring
variable data created in the CX-Designer
to the CX-Programmer.
CX-Programmer Support Software
for PLCs
CX-Designer
Screen Designing Software for
NS-series PT Touch Panels
Starting was
not possible.
Starting was
possible.